NOTE
Follow these precautions for any electrically controlled
leveler (i.e.
RITE-HITE
levelers HD series, HQ series,
APB series, or interconnected/interlocked mechanical
series) that has been installed or is being installed into
this dock position. Make sure that all power and ground
wires have been disconnected properly.
NOTE
Check appropriate leveler owner’s manual for this
information.
Anchor Installation Instructions
1.
Put roller track plate in place.
2.
Drill hole of 5/8" diameter and 4-1/2" deep. Clean
out hole and insert anchor, making certain that the
threaded wedge is put in first. Do not disassemble
anchor prior to installation. Install all anchors and
torque to 100 ft-lbs. See Figure 8.
RITE-HITE VBR-400 DOK-LOK
Owner’s Manual
Do not weld or torch cut in enclosed areas
without proper ventilation. Follow appropriate
equipment manufacturer safety information.
FIGURE 6 — WELDING ROLLER TRACK, FRONT VIEW
FIGURE 7 — WELDING ROLLER TRACK, SIDE VIEW
Fifteen (15) concrete anchors are provided with
each vehicle restraint. You must install an
anchor in each roller track plate hole except
those plug-welded to embedded steel.
Threaded
Wedge
Track
Plate
Concrete
Anchor
RHC
Part Number
53150
FIGURE 8 — ANCHOR INSTALLATION
• A plumb roller track plate is required. If the
dock face is not plumb/perpendicular, contact
your
RITE-HITE
representative or
RITE-HITE
at (800) 456-0600.
• The carriage roller track cannot be bent or
deformed. Straighten or replace as required.
CAUTION
IMPORTANT
IMPORTANT