background image

Pork King Series 

Installation Instructions

 

A.

 

Location

 - Putting the fountain in a location that offers protection from the wind will enhance the 

performance of the fountain. Livestock will tend to gather in this protected area, enticing them to drink more. 

Access panel should be opposite of prevailing winter wind to give additional protection to the supply line.  

B.

 

Water Supply Line

 - Horizontal underground water line (1) should be sized to account for pressure drop, 

relating to distance, and placed well below frost line. A one-inch vertical supply pipe (2) is recommended. A shut-

off valve (3) should be installed under fountain to allow for easier servicing. For optimum serviceability, a stop 

and waste valve can be installed below frost level to drain water back when unit is not in use. Vertical supply line 

must be centered in riser tube (4) to provide an air space between the line and frozen ground outside of tube. 

Flush water supply line thoroughly before connection to fountain. Water supplies with foreign material such as 

sand, rust, etc. may require a filter to keep fountain valve working properly. 

C.

 

Riser Tube

 - Install a riser tube and extend it at least one foot below frost line or 

down to horizontal underground water line. For optimum water line protection, use 

the 12” diameter insulated Ritchie Thermal Tube, part numbers and sizes are shown 

to the left. Tube opening must be kept clear. 

NOTE: The supply line touching the 

riser tube is the most common cause of the supply line freezing. Do not surround 

the supply line with insulation, wood, or other foreign material. Any foreign 

material in the tube may cause frost to migrate to the supply line causing it to 

freeze.

 

D.

 

Mounting Platform

 - A concrete platform must be provided for all fountains. Use a minimum of 4” thick, 

(6” recommended thickness), and 8” square for hog fountains (otherwise large enough to accommodate fountain), 

and additional 4” step (on top of the platform) extending 18” out from each side of the unit. This will protect the 

unit from manure handling equipment, as well as discouraging animals from defecating in the fountain. The 

concrete step and platform should slope away from the fountain for drainage. A rough broom finish to concrete 

surface provides better footing for livestock. 

E.

 

Anchoring Fountain

 – Pork King 2 & 4 are provided with built in hold-downs to anchor your unit securely 

to the concrete.  Pork King 1 and 2-1 have built in hold-downs as well as 2 stainless steel hold down angles which 

Ritchie Thermal Tube 

Part # 

Description 

18158 

1’ Top Section 

16417 

2’ Top Section 

16612 

4’ Top Section 

16416 2’ 

Extension 

Pork King Series Instruction Manual

1

18 October, 2012

Содержание Pork King Series

Страница 1: ...inest watering fountain on the market This unit is built to give you excellent service when properly installed and maintained Please follow instructions carefully Read and understand all instructions...

Страница 2: ...water line For optimum water line protection use the 12 diameter insulated Ritchie Thermal Tube part numbers and sizes are shown to the left Tube opening must be kept clear NOTE The supply line touchi...

Страница 3: ...e over the riser tube G Electrical Connection The electrical installation should be made and maintained by a qualified electrician conforming to national and local codes The 3 wire power to the founta...

Страница 4: ...thermostat turn turn To lock in position after adjustment turn turn back As the thermostat is moved toward the heater the water temperature in the trough is lowered The best location is determined by...

Страница 5: ...er rights which vary from state to state All warranty claims must be processed through an Authorized Ritchie Dealer Distributor Proof of purchase is required This warranty is not transferrable The per...

Страница 6: ...30 48W Cable Heater 120 Volt 1 Pkg 5 14150 125W Element 120 Volt 4 Pkg NS 12584 Supply Hose Assembly 1 Pkg 6 11885 Disc Thermostat Red 1 Pkg NS 18075 Drain Washers 6 Pkg 1 Pkg 7 13613 Float W Short Ar...

Страница 7: ...Element 120 Volt 2 Pkg NS 13830 48W Cable Heater 120 Volt 1 Pkg 6 11885 Disc Thermostat Red 1 Pkg NS 12584 Supply Hose Assembly 1 Pkg 7 13613 Float W Short Arm 1 Pkg NS 18075 Drain Washers 6 Pkg 1 Pkg...

Страница 8: ...S 12584 Supply Hose Assembly 1 Pkg 6 11885 Disc Thermostat Red 1 Pkg NS 18075 Drain Washers 6 Pkg 1 Pkg 7 13613 Float W Short Arm 1 Pkg NS 16128 Complete Accessory Pkg 1 Pkg 8 11515 Valve Bracket Pkg...

Страница 9: ...kg 1 Pkg NS 16363 Insulation Pkg 1 Pkg 5 11419 250W Element 120 Volt 1 Pkg NS 12584 Supply Hose Assembly 1 Pkg 6 11885 Disc Thermostat Red 1 Pkg NS 18075 Drain Washers 6 Pkg 1 Pkg 7 13613 Float W Shor...

Страница 10: ...ping is centered in riser tube Check that riser tube is free of water and mud that may freeze Check that flexible hose does not touch side of casing or frame Check casing for air leaks Check for air g...

Отзывы: