Installation & Servicing Instructions Rinnai Q Premier
12
5.2 Fitting the boiler
- Remove the packaging materials.
-
Leave the boiler on its pallet during unpacking. When unpacking, the casing
can be removed from the boiler. This part can be kept seperate during
installation. It must be reinstalled on the boiler and fi xed with the screws
behind the door before the boiler is started up.
The boiler can be placed on most
fl
oor surfaces. The boiler is not allowed or approved
to be installed on carpet
fl
ooring.
- The
fl
oor must be
fl
at and of suf
fi
cient strength in order to be able to securely hold
and support the boiler weight with its water content.
- Take note of the necessary space around the boiler for installation of the venting
system, pipework and for servicing. See drawing in section 5.3.
Lift the boiler only by the boiler's grips and the rear wall. See fi gure 3a.
Lifting and carrying precautions.
To avoid personal injury please follow these recommendations:
- Always lift the boiler with 2 people or use special equipment.
- When lifting the boiler, bend the knees, and keep the back straight and feet
apart.
- Do not lift and twist at the same time.
- Lift and carry the boiler close to the body.
- Wear protective clothing and gloves to protect from any sharp edges.
- Dispose the packaging materials.
Lift the boiler in it's up right position and place the boiler in it's defi ned place.
Use the adjustment feet to position the boiler vertical using a plumb rule. See
fi gure 3b.
Protect all parts against impacts during transportation and installation.
!
CAUTION
NOTICE
i
NOTICE
i
!
WARNING
position boiler grips
Q Premier
fi gure 3a
!
WARNING
adjustment feet Q Premier
fi gure 3b