58
Rinnai I
-
Series Condensing Boiler Combi Manual
Example: If there is a 4 GPM system flow demand, there would be approximately 15 ft of head
available for the system. If more pressure drop is present in the central heating system, a means of
hydraulic separation is necessary.
0
1
2
3
4
5
6
7
8
9
10
20
15
25
30
10
5
0
Water Flow (GPM)
P
re
ssur
e
Loss
(
Fe
et
o
f He
ad
)
11
12
55
50
45
40
35
i120C
i060C and
i090C
Model
Available Pressure Drop
i060C
15 ft at 3.2 GPM
1
i090C
8.5 ft at 4.8 GPM
1
i120C
Not Applicable
2
1
If the pressure drop of the system exceeds the available pressure, the use of primary/secondary
piping is necessary.
2
Rinnai requires the use of primary/secondary piping with the use of this model.
NOTE
To ensure proper
CH
and
DHW
internal flow rates,
the pump should be set to speed 3.
Содержание I Series
Страница 124: ...124 Rinnai I Series Condensing Boiler Combi Manual ...
Страница 125: ...Rinnai I Series Condensing Boiler Combi Manual 125 ...
Страница 134: ...134 Rinnai I Series Condensing Boiler Combi Manual ...
Страница 135: ...Rinnai I Series Condensing Boiler Combi Manual 135 ...
Страница 136: ...136 Rinnai I Series Condensing Boiler Combi Manual 800000111 3 2019 ...