Demand Duo
™
R
-
Series Installation and Operation Manual
24
□
Verify proper clearances around the vents.
□
Ensure that the Combustion Air Requirements are followed that will provide sufficient combustion air
for the appliance.
□
Ensure you have used the correct venting products for Category 1 and that you have completely
followed the venting manufacturer
’
s installation instructions and these installation instructions. All
installations must be vented in accordance with National Fuel Gas Code NFPA 54/ANSI Z223.1
-
latest edition and the requirements of state or local codes. In Canada, the furnaces must be vented
in accordance with the National Standard of Canada and CAN/CSA B149.1
-
latest editions and
amendments and the codes of the local utility or other authority having jurisdiction.
□
All horizontal vent runs must be sloped up away from the water heater a minimum of 1/4 in. (6 mm)
per foot.
□
Verify that the vent termination clearances are followed.
□
Verify that there is adequate combustion air.