Rinnai New Zealand
Compact Op/Install Manual: 10170-C 02-09
19
Installation Information - Commissioning
Complete the installation and commissioning checklist below and make sure this manual is left
with the customer. Explain to the customer about the use and care of the unit and understands
the instructions and operation of the appliance.
If operating without a dress guard please following safety instructions to prevent the risk of
injury.
NO
yES
Appliance positioned in a suitable location? (i.e. clearances, combustibles
etc.)
Was a Rinnai approved flue system installed and is the flue drawing
effectively?
Has specified gas pressures been checked and set?
Is the logset located correctly?
Have the granules been placed evenly and on top of the burner and free of
dust?
Has the appliance been tested for correct operation?
Is the customer fully aware of the operating procedure?
Installer Details
Company name:______________________________________________________________
Installer name:_______________________________________________________________
Address:____________________________________________________________________
___________________________________________________________________________
Phone:_______________________________
Mobile:______________________________
Permit number for installation:___________________________________________________
Signed:______________________________
Date:_______________________________