Page 9
Right order as shown in the pictures below
1.Remove 4 screws
2.Open cover with flat head screwdriver
3.Take out rotor and clean Install rotor and check seal ring in position or loose the nuts
in inlet if necessary and take out rotor to clean.
4. Place parts back together making sure the impeller is spinning freely and that all the
components are in it.
5.After tightening the two fittings on the device, turn on the hot water faucet and let the
water flow through the device for about 2 to 3 minutes to ensure that all air is
discharged from the water pipe. If this step is not followed, it may cause permanent
damage to the heating elements.
6.. Turn on power to the unit and verify if the display remains illuminated with water
running. Let water run for approximately 45/60 seconds, within this time the unit should
be heating water.
Note:
1.Turn off the power circuit and shut off water feeding before maintenance.
2.Take care of the water leakage during maintenance.
Содержание EI06
Страница 2: ...rinkmo team outlook com Page 2 Official website https rinkmo net ...
Страница 18: ...rinkmo team outlook com Page 18 d Facebook support https www facebook com heater rinkmo ...
Страница 35: ...rinkmo team outlook com Page 35 Activity H verifying Connection ...
Страница 36: ...rinkmo team outlook com Page 36 ...
Страница 39: ...rinkmo team outlook com Page 39 Wiring diagram ...
Страница 41: ...rinkmo team outlook com Page 41 ...
Страница 42: ...rinkmo team outlook com Page 42 ...