2 Installation
2-2. Installation of pyrolyzer unit
- 13 -
PLU-70
<Install Dimension and Maintenance Space>
CAUTION
•
The installation points of the pyrolyzer unit PLU-70 and the gas detector head GD-70D series
should be away from each other for 80
±
5 mm (with a clearance of 5 to 15 mm).
It is recommended that installation points of the sets should be away from each other for 10 mm
or more. Intervals between installation points must be at least 5 mm.
•
The PLU-70 must be installed on the LEFT of the gas detector head GD-70D series.
(170)
(30)
(150)
Leave the diagonal line area so that the installation space is reserved.
(300)
PLU-70
(Left)
Gas detector
head
(Right)
PLU-70
(Left)
Gas detector
head
(Right)
(Unit: mm)
Maintenance space
Maintenance space
Maintenance space
Maintenance space
Maintenance space
Maintenance space
When installing by using 2 screws
When installing by using 3 screws
www.
.com
1.800.561.8187