![Riken Keiki GD-A80 Series Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/riken-keiki/gd-a80-series/gd-a80-series_operating-manual_1461458021.webp)
5 How to Operate
5-1. Preparation for start-up
- 21 -
5
How to Operate
5-1. Preparation for start-up
Before connecting a power supply, read and understand the following precautions. Ignoring these
precautions may cause an electric shock or damage the detector.
Check that the detector is installed properly.
Connect the detector to a grounding circuit.
Check that the external wiring is done properly.
5-2. How to start the detector
Before supplying power to the detector, check that the preparations described in "5-1. Preparation for
start-up" are completed. Turn on the indicator/alarm unit power and check that it functions normally with
reference to the operating manual of the indicator/alarm unit.
5-3. How to detect
Turn on the power switch of the indicator/alarm unit. Gas detection starts after the initial clear.
5-4. How to exit
Turn off the power switch of the indicator/alarm unit.
CAUTION
When the detector is installed newly or the sensor is replaced with new one, the sensor must
be warmed up for a specified period which is determined depending on the type of the sensor
after the detector is started. Only as a guide, perform a warm-up of around one hour after
switching it on.
After the warm-up is completed, perform a calibration.
WARNING
When the detector is turned off, an alarm may be triggered on the upper (central) system.
Before turning off the detector, INHIBIT (point skip) on the upper (central) system must be
activated.
Also, check the operation of the devices connected to this gas leak detection/alarm system to
see if power can be turned off.
Содержание GD-A80 Series
Страница 1: ...PT2E 1856 Fixed Combustible Gas Detector Head GD A80 Series GD A80 70 Operating Manual...
Страница 34: ......