28
Pipe ID Control System. RF096-35/55-100 Series
RF096-35/55-100 [Revision 1.0.0] 12.12.2018
·
PLC reads that the pipe control system has completed the procedure and resets
Move to zero
= FALSE.
·
The pipe control system resets variables
Move to zero running
= FALSE,
Move to zero Done
= FALSE.
12.5. Communication tests
The user can perform communication tests by connecting the system to the PC
using the Ethernet connector.
Step 1: Run SSH client
1. On the PC, we use "PuTTY" to test.
2. Enter a host name 192.168.1.100 as shown below, and click
Connect
(
Open
).
Step 2: Work with terminal
1. Write Login and Password:
Login: pi
Password: raspberry
2. After 5-10 seconds, when you see a picture as shown below (the process is
restarted for a new session), press
Ctrl+C
to end it.