Combustion head adjustment
At this point of the installation, the combustion head is fixed to the
boiler as shown in Fig. 18. It is therefore especially easy to adjust,
and this adjustment depends only on the maximum output of the
burner.
Two adjustments of the head are foreseen:
–
external air R1
–
central air R3
In the diagram (Fig. 20) find the notch at which to adjust both air
and central gas/air.
External air R1 adjustment
Rotate the screw 4)(Fig. 21) until the notch you have found
corresponds with the front surface 5) of the flange.
Central air R3 adjustment
Loosen the 2 screws 1) and rotate the ring nut 2) until the
notch you have found corresponds with the screw 1).
Block the 2 screws 1).
NOTE:
the diagram (Fig. 20) indicates the optimum adjustment for a
type of boiler according to Fig. 4 on page 10.
Fig. 20
Max burner output
No
. notches
20081409
WARNING
To facilitate adjustment, loosen the screw 6),
adjust and then lock.
WARNING
The burner leaves the factory with the ring nut 3)
set to notch 0.
Do not change this value.
WARNING
The adjustments indicated can be modified during
the initial start-up.
2
(R2)
1
3
6
4
(R1)
5
1
2 (R3)
3
Fig. 21
D7675
Содержание RS 200/EV BLU TL
Страница 2: ...Original instructions...
Страница 42: ...20080730 40 GB Appendix Electrical panel layout 0 1 2 2 2 3 2 4 2 2 2 2 2 2 2 52 5 5 2 2 3 2 67 8 9...
Страница 43: ...41 20080730 GB Appendix Electrical panel layout 0 1 1 0 2 0 00 0 1 3 414 56 2 7 8 03 59 3 A...
Страница 44: ...20080730 42 GB Appendix Electrical panel layout...
Страница 45: ...43 20080730 GB Appendix Electrical panel layout 0 1 1 2 1 1 1 1 1 3 3 3 1 1 0 1 1 4 4 1 4 41 1 1 5 6 4 4 768 9...
Страница 49: ......
Страница 50: ......
Страница 51: ......