![Riello RLS 28/E Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/riello/rls-28-e/rls-28-e_installation-use-and-maintenance-instructions_1460052034.webp)
20059594
32
GB
Start-up, calibration and operation of the burner
5.9
Final checks (with the burner working)
➤
Open the control limit operation
➤
Open the high limit operation
➮
The burner must stop
➤
Rotate the maximum gas pressure switch knob to the mini-
mum end-of-scale position (if installed)
➤
Rotate the air pressure switch knob to the maximum end of
scale position
➮
The burner must stop in lockout
➤
Switch off the burner and disconnect the voltage
➤
Rotate the minimum gas pressure switch
➤
Regulate the minimum oil pressure switch
➮
The burner must not start
➤
Cover the UV flame sensor
➮
The burner must stop in lockout due to firing failure
WARNING
Make sure that the mechanical locking systems on
the different adjustment devices are fully tightened.
Содержание RLS 28/E
Страница 2: ......
Страница 38: ...20059594 36 GB Appendix Spare parts A Appendix Spare parts...