19
20148653
GB
Installation
5.6
Access to head internal part
In order to reach inside the combustion head (Fig. 12) proceed as
follows:
remove the screw 1) and the internal part 2).
5.6.1
Combustion head pre-calibration
For the
RLS 130
model, check, at this point, whether the
maximum output of the burner in the 2nd stage is within area
A
or in area
B
of the firing rate. See "Firing rates” on page 11.
–
If it is in area A, no intervention is required.
–
However, if it is in area B:
Loosen the screws 1)(Fig. 13) and disassemble the blast
tube 2).
Move the rod 3)(Fig. 13) from position A to position B,
thereby drawing back the shutter 4).
Reassemble the blast tube 2)(Fig. 13) and the screws 1).
Once this operation (if necessary) has been carried out, fix the
flange 9)(Fig. 11 on page 18) to the boiler plate, interposing the
insulating gasket 7)(Fig. 11 on page 18) supplied. Use the 4
screws, also supplied with the unit, after protecting the thread
with anti-seizing product.
5.7
Electrode positions
Be careful as some drops of fuel may leak out
during this phase.
Fig. 12
D1122
Fig. 13
D1192
ATTENTION
Check that the electrodes are positioned
correctly, as in Fig. 14, complying with the
dimensions indicated.
Fig. 14
D1124
Содержание RLS 100
Страница 2: ...Translation of the original instructions ...
Страница 55: ...53 20148653 GB Appendix Electrical panel layout 0 1 2 1 2 3 3 3 4 3 5 3 3 3 3 3 3 3 63 6 6 3 3 4 3 ...
Страница 56: ...20148653 54 GB Appendix Electrical panel layout 0 1 1 1 ...
Страница 57: ...55 20148653 GB Appendix Electrical panel layout 0 1 1 1 2 2 ...
Страница 58: ...20148653 56 GB Appendix Electrical panel layout 0 1 2 1 3 3 0 4 0 3 5 6 7 6 7 8 99 8 99 6 7 4 2 1 8 6 6 RLS 70 ...
Страница 60: ...20148653 58 GB Appendix Electrical panel layout 0 1 2 1 3 3 0 4 0 3 5 6 7 6 7 8 99 8 99 6 7 4 2 1 6 6 RLS 130 ...
Страница 62: ......
Страница 63: ......