20148653
24
GB
Installation
5.11
Pump
5.11.1 Technical data
Tab. J
Suction line
G 1/4"
2
Return line
G 1/4”
3
Gauge connection
G 1/8”
4
Vacuometer connection
G 1/8”
5
Pressure adjuster
5.11.2 Priming pump
Make sure that the valves on the suction line are open and that
there is fuel in the tank.
In order for self-priming to take place, one of the screws 3) of the
pump, see Fig. 23, must be loosened in order to bleed off the air
contained in the suction line.
Pump
SUNTEC AJ 6 CC
Min. delivery rate at 12 bar pressure
220 kg/h
Delivery pressure range
10 - 20 bar
Max. suction depression
0.45 bar
Viscosity range
2.8 - 75 cSt.
Max. light oil temperature
60°C
Max. suction and return pressure
2 bar
Pressure calibration in the factory
12 bar
Filter mesh width
0,150 mm
Fig. 23
D1177
ATTENTION
Before starting the burner, make sure that the tank
return line is not clogged.
Obstructions in the line could cause the sealing
organ located on the pump shaft to break.
ATTENTION
The pump leaves the factory with the by-pass
closed.
Содержание RLS 100
Страница 2: ...Translation of the original instructions ...
Страница 55: ...53 20148653 GB Appendix Electrical panel layout 0 1 2 1 2 3 3 3 4 3 5 3 3 3 3 3 3 3 63 6 6 3 3 4 3 ...
Страница 56: ...20148653 54 GB Appendix Electrical panel layout 0 1 1 1 ...
Страница 57: ...55 20148653 GB Appendix Electrical panel layout 0 1 1 1 2 2 ...
Страница 58: ...20148653 56 GB Appendix Electrical panel layout 0 1 2 1 3 3 0 4 0 3 5 6 7 6 7 8 99 8 99 6 7 4 2 1 8 6 6 RLS 70 ...
Страница 60: ...20148653 58 GB Appendix Electrical panel layout 0 1 2 1 3 3 0 4 0 3 5 6 7 6 7 8 99 8 99 6 7 4 2 1 6 6 RLS 130 ...
Страница 62: ......
Страница 63: ......