background image

5

GENERAL INFORMATION

GENERAL INFORMATION

SYSTEM LAYOUT

1

2

3

4

10

11

5

6

7

8

9

12

18

16

19
20

14

13

15

17

VE

SV

M

R

EAF

SB

UAC

Mo

P

Storage cylinder

Top coil

Preset for lifting handles (accessory) and/or de-

vice grounding point

Bottom coil

Cover

Insulation

Solar controller

Display

Multidirectional joystick

10 

Flange for heater inspection

11 

Technical box

12 

Pump

13 

Safety valve (6 bar)

14 

Tap A for system filling/draining

15 

Tap B for system filling/draining

16 

Delivery Valve (solar plant delivery) with built-in 

non-return valve

17 

Outlet temperature gauge

18 

Return Valve (solar plant return) with built-in 

non-return valve

19 

Return temperature gauge

20 

Pressure gauge

UAC

 

Domestic hot water outlet

EAF

 

Domestic cold water inlet

SB

 

Storage cylinder drain

M

 

Solar circuit outlet. Inlet of heat transfer fluid 

coming from solar collector.

R

 

Solar circuit return. Outlet of heat transfer fluid 

towards solar collector.

SV

 

Safety valve drain

VE

 

Expansion tank fitting

P

 Socket

Mo

 Guide

Содержание RBS 200 2S Ready-i

Страница 1: ...cod 20122045 rev 1 03 2017 RBS 2S Ready i EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...ISH CONTENTS The following symbols are used in this manual 9 9CAUTION Identifies actions that require caution and adequate preparation 0 0STOP Identifies actions that you MUST NOT do This manual Code...

Страница 3: ...the product purchase documents to be presented to the R authorised Technical Assistance Service to request a service call under warranty 9 9Size the solar expansion tank so as to ensure complete ab s...

Страница 4: ...te This lists the technical specifications and performance of the product Model bar W l W kW l 1 BOLLITORE SOLARE Modello Matricola Codice Anno m2 m2 kW m2 T067765IES SOLARBOILER Serial numb Code Year...

Страница 5: ...6 bar 14 Tap A for system filling draining 15 Tap B for system filling draining 16 Delivery Valve solar plant delivery with built in non return valve 17 Outlet temperature gauge 18 Return Valve solar...

Страница 6: ...3 1 51 W K Energy class B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 40...

Страница 7: ...tank lower part 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Страница 8: ...than IP X0D 0 3 m 0 6 m 0 3 m 0 6 m 0 7 m NOTE the above indicated dimensions are recommended for a correct maintenance and access to the device 9 9When installing the boiler allow sufficient space ar...

Страница 9: ...1 33 450 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1338 1838 1644 1988 mm B 1170 1670 1440 1784 mm C 1098 1438 1289 1653 mm D 953 1233 1064 1428 mm F 598 693 684 7...

Страница 10: ...revailing standards of the installation country respect the polarity of the L1 Phase N Neutral con nections use cables with insulation and cross section conforming to applicable standards minimum cros...

Страница 11: ...to terminal board M1 of solar regulator terminals L N GND making refer ence to the instructions provided in the specific regulator manual Once electrical connections are completed fasten cables using...

Страница 12: ...r collectors For further information please refer to the glycol safety data sheet When using glycol not pre mixed Do NOT part fill the circuit with pure glycol then add water later Ensure that filling...

Страница 13: ...ressure To set the system pressure correctly refer to the design manual 0 0Do not fill the system in bright sunny conditions or if the collectors are hot 9 9Use a manual bleed valve which should be in...

Страница 14: ...20 3 Safety valve removal 9 9Remove when system has cooled down Before removing the safety valve Cut power off to the solar station and to the connected integration system by setting the system s mai...

Страница 15: ...with the product 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heat...

Страница 16: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Отзывы: