background image

9

INSTALLATION

INSTALLATION

13 

WATER CONNECTIONS

E

D

C

B

A

EAF

RC

RL

MC

UAC

AD

H

O

N

I

VE

L

P

185mm

DF

Psr

Psc

R

M

F

G

DESCRIPTION

RBS 2S Ready-i

200

300

430

550

VE 

Expansion tank fitting

1/2” M

Ø

UAC 

Domestic hot water outlet

1” M

Ø

MC 

Outlet from boiler

1” M

Ø

RC 

Return to boiler

1” M

Ø

Outlet from solar collector

1” M

Ø

Return to solar collector

1” M

Ø

RL 

DHW recirculation

1” M

Ø

EAF (SB)  Domestic cold water inlet

1” M

Ø

Psc 

Diameter/length of boiler sensor socket

18/180

mm

Psr 

Diameter/length of solar controller sensor 

socket

18/180

mm

AD 

Quantity/diameter/length of magnesium 

anode

1/33/450

1/33/450

1/33/520

1/33/520

mm

DF 

Flange internal diameter

130

130

130

130

mm

A

1338

1838

1644

1988

mm

B

1170

1670

1440

1784

mm

C

1098

1438

1289

1653

mm

D

953

1233

1064

1428

mm

F

598

693

684

788

mm

G

243

253

329

348

mm

H

171

171

208

207

mm

I

1029

1323

1174

1538

mm

L

738

903

824

1088

mm

O

403

393

427

443

mm

P

Ø 604

Ø 604

Ø 755

Ø 755

mm

M8 threaded inserts for grounding point/

accessory handles connection

700

700

700

700

mm

 

9

It is recommended to install shut-off valves at domestic water inlet and outlet.

 

9

Check the efficiency of the seals when filling/refilling the storage cylinder.

 

9

Any electric junction between probe cable and extensions for the connection to the electric panel must be soldered and pro-

tected with a sheath or a suitable electric insulation.

Содержание RBS 200 2S Ready-i

Страница 1: ...cod 20122045 rev 1 03 2017 RBS 2S Ready i EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...ISH CONTENTS The following symbols are used in this manual 9 9CAUTION Identifies actions that require caution and adequate preparation 0 0STOP Identifies actions that you MUST NOT do This manual Code...

Страница 3: ...the product purchase documents to be presented to the R authorised Technical Assistance Service to request a service call under warranty 9 9Size the solar expansion tank so as to ensure complete ab s...

Страница 4: ...te This lists the technical specifications and performance of the product Model bar W l W kW l 1 BOLLITORE SOLARE Modello Matricola Codice Anno m2 m2 kW m2 T067765IES SOLARBOILER Serial numb Code Year...

Страница 5: ...6 bar 14 Tap A for system filling draining 15 Tap B for system filling draining 16 Delivery Valve solar plant delivery with built in non return valve 17 Outlet temperature gauge 18 Return Valve solar...

Страница 6: ...3 1 51 W K Energy class B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 40...

Страница 7: ...tank lower part 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Страница 8: ...than IP X0D 0 3 m 0 6 m 0 3 m 0 6 m 0 7 m NOTE the above indicated dimensions are recommended for a correct maintenance and access to the device 9 9When installing the boiler allow sufficient space ar...

Страница 9: ...1 33 450 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1338 1838 1644 1988 mm B 1170 1670 1440 1784 mm C 1098 1438 1289 1653 mm D 953 1233 1064 1428 mm F 598 693 684 7...

Страница 10: ...revailing standards of the installation country respect the polarity of the L1 Phase N Neutral con nections use cables with insulation and cross section conforming to applicable standards minimum cros...

Страница 11: ...to terminal board M1 of solar regulator terminals L N GND making refer ence to the instructions provided in the specific regulator manual Once electrical connections are completed fasten cables using...

Страница 12: ...r collectors For further information please refer to the glycol safety data sheet When using glycol not pre mixed Do NOT part fill the circuit with pure glycol then add water later Ensure that filling...

Страница 13: ...ressure To set the system pressure correctly refer to the design manual 0 0Do not fill the system in bright sunny conditions or if the collectors are hot 9 9Use a manual bleed valve which should be in...

Страница 14: ...20 3 Safety valve removal 9 9Remove when system has cooled down Before removing the safety valve Cut power off to the solar station and to the connected integration system by setting the system s mai...

Страница 15: ...with the product 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heat...

Страница 16: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Отзывы: