background image

3

GENERAL INFORMATION

GENERAL INFORMATION

GENERAL SAFETY INFORMATION

 

9

Check that the product is complete, undamaged and as or-

dered as soon as you receive it. Report any discrepancies or 

damage to the 

R

 dealer who sold it.

 

9

This product must be installed by a legally qualified heat-

ing engineer. On completion of the installation, the install-

er must issue the owner with a declaration of conformity 

confirming that the installation has been completed to the 

highest standards in compliance with the instructions pro-

vided by 

R

 in this instruction manual, and that it con-

forms to all applicable laws and standards.

 

9

This product must only be used for the purpose for which it 

is designed and made, as specified by 

R

R

 declines 

all responsibility, contractual or other, for damage to prop-

erty or injury to persons or animals caused by improper in-

stallation, adjustment, maintenance or use.

 

9

The product must be serviced at least once a year. Servicing 

must be arranged in advance with the 

R

 Technical Assis-

tance Service.

 

9

All servicing and repairs must be performed by a qualified 

heating engineer.

 

9

If water leaks from the storage cylinder, turn off the water 

supply and contact 

R

’s Technical Assistance Service or a 

qualified heating engineer immediately.

 

9

If the product is not going to be used for an extended peri-

od of time, contact the manufacturer’s Technical Assistance 

Service to have at least the following operations performed:

 

− Close the shut-off cocks for the domestic hot water circuit

 

− Shut down the boiler connected to the storage cylinder 

as instructed in its own manual

 

− Switch the storage cylinder OFF at the control panel (if 

fitted) and at the mains power switch

 

− Drain the central heating circuit and domestic hot water 

circuit if there is any risk of freezing.

 

9

This instruction manual is an integral part of the product. It 

must be kept safe and must ALWAYS accompany the product, 

even if it is sold to another owner or transferred to another 

user or to another installation. If you lose this manual, or-

der a replacement immediately. Keep the product purchase 

documents to be presented to the 

R

 authorised Technical 

Assistance Service to request a service call under warranty.

 

9

Size the solar expansion tank so as to ensure complete ab-

sorption of the expansion of the fluid contained within the 

system, with reference to the prevailing regulations on the 

matter. In particular, consider fluid characteristics, consid-

erable fluctuation of service temperature and vapour that 

might be generated during solar collector stagnation stage. 

Proper size of expansion tank ensures setting off of all vol-

ume changes of the heat transfer fluid, avoiding excessive 

pressure increase. Limited pressure changes avoid reach-

ing safety valve opening pressure and the consequent fluid 

drainage.

PRECAUTIONS

The operation of any appliance that uses electrical power de-

mands that a number of fundamental safety precautions be re-

spected. In particular:

 

0

Never attempt to install the system without using suitable 

personal  protection  equipment  and without  following  all 

applicable occupational safety standards.

 

0

It is forbidden to touch the device while barefoot or with 

wet or moist body parts.

 

0

It is forbidden to perform any technical or cleaning opera-

tions before having disconnected the device from its elec-

trical power supply, by setting the system's main switch to 

"off".

 

0

It is forbidden to pull, detach, or twist the electrical cables 

protruding from the device, even if it is disconnected from 

its electrical power supply.

 

0

Do not expose the storage cylinder to the elements. It is not 

designed for use outdoors.

 

0

If solar plant pressure decreases, it is forbidden to top up 

with only water as there is a danger of freezing and over-

heating.

 

0

Do not use connections or safety devices or fittings (expan-

sion vessels, pipes, insulation) that are not specifically de-

signed and tested for use in solar water heating systems.

 

0

Do not allow children or infirm persons to operate the sys-

tem unsupervised.

 

0

Do not dispose of packaging material into the environment, 

or leave it within the reach of children, since it can become 

a potential hazard. Dispose of packaging material in com-

pliance with applicable legislation.

 

0

It is forbidden to use the panelling as a hold for handling 

purposes.

General information

Содержание RBS 200 2S Ready-i

Страница 1: ...cod 20122045 rev 1 03 2017 RBS 2S Ready i EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...ISH CONTENTS The following symbols are used in this manual 9 9CAUTION Identifies actions that require caution and adequate preparation 0 0STOP Identifies actions that you MUST NOT do This manual Code...

Страница 3: ...the product purchase documents to be presented to the R authorised Technical Assistance Service to request a service call under warranty 9 9Size the solar expansion tank so as to ensure complete ab s...

Страница 4: ...te This lists the technical specifications and performance of the product Model bar W l W kW l 1 BOLLITORE SOLARE Modello Matricola Codice Anno m2 m2 kW m2 T067765IES SOLARBOILER Serial numb Code Year...

Страница 5: ...6 bar 14 Tap A for system filling draining 15 Tap B for system filling draining 16 Delivery Valve solar plant delivery with built in non return valve 17 Outlet temperature gauge 18 Return Valve solar...

Страница 6: ...3 1 51 W K Energy class B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 40...

Страница 7: ...tank lower part 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Страница 8: ...than IP X0D 0 3 m 0 6 m 0 3 m 0 6 m 0 7 m NOTE the above indicated dimensions are recommended for a correct maintenance and access to the device 9 9When installing the boiler allow sufficient space ar...

Страница 9: ...1 33 450 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1338 1838 1644 1988 mm B 1170 1670 1440 1784 mm C 1098 1438 1289 1653 mm D 953 1233 1064 1428 mm F 598 693 684 7...

Страница 10: ...revailing standards of the installation country respect the polarity of the L1 Phase N Neutral con nections use cables with insulation and cross section conforming to applicable standards minimum cros...

Страница 11: ...to terminal board M1 of solar regulator terminals L N GND making refer ence to the instructions provided in the specific regulator manual Once electrical connections are completed fasten cables using...

Страница 12: ...r collectors For further information please refer to the glycol safety data sheet When using glycol not pre mixed Do NOT part fill the circuit with pure glycol then add water later Ensure that filling...

Страница 13: ...ressure To set the system pressure correctly refer to the design manual 0 0Do not fill the system in bright sunny conditions or if the collectors are hot 9 9Use a manual bleed valve which should be in...

Страница 14: ...20 3 Safety valve removal 9 9Remove when system has cooled down Before removing the safety valve Cut power off to the solar station and to the connected integration system by setting the system s mai...

Страница 15: ...with the product 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heat...

Страница 16: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Отзывы: