background image

9

TECHNICAL ASSISTANCE SERVICE

 

TECHNICAL ASSISTANCE SERVICE

15 

MAINTENANCE

Scheduled maintenance is essential for the safety, efficiency and 

long working life of your storage cylinder. Proper maintenance 

also reduces energy consumption and ensures reliability over 

time. Have your storage cylinder serviced either by the manu-

facturer’s Technical Assistance Service or by a qualified heating 

engineer at least once a year.

 

Perform the following operations before beginning any main-

tenance:

 

− Switch the electricity supply to the storage cylinder’s 

valve group and to any associated boiler OFF at the main 

switch and at the control panel

 

 

− Close the shut-off cocks for the domestic hot water circuit

 

− Drain the storage cylinder’s DHW (secondary) water cir-

cuit.

 

 

16 

CLEANING AND REMOVING INTERNAL COMPONENTS

EXTERNAL CLEANING

Clean the outside of the storage cylinder with a soft cloth 

damped in soapy water. To remove stubborn marks, use a cloth 

damped in a 50% mix of water and denatured alcohol or a suit-

able cleaning product. Dry the storage cylinder after cleaning it.

 

0

Do not use abrasive products, petrol or triethylene.

 

INTERNAL CLEANING

 

Removing and checking the first magnesium anode

If the magnesium anode is fitted in the top of the storage cylin-

der, remove the cover (1) and insulation (2), and use a suitable 

wrench to unscrew the anode holder (3).

 

If  the  magnesium  anode  is  fitted  in  position  (A),  remove  the 

cover (4) and use a suitable wrench to unscrew the anode hold-

er (3).

 

Check the magnesium anode for wear and replace it if neces-

sary.

On completion of cleaning, follow the above steps in the reverse 

order to refit all removed parts.

 

NOTE: Tighten the anode plug to a torque of 25-30 Nm.

1

2

3

A

3

4

Cleaning inside the storage cylinder

 

− Remove the screws (4)

 

− Remove the flange cover (5)

 

− Remove the insulation (6)

 

− Unscrew the bolts (7) and remove the cover (8)

 

− Remove the seal (9)

 

− Clean inside the storage cylinder and remove any resi-

dues through the access hole.

9

8

7

6

5

4

 

9

Check the seal for wear and replace it if necessary.

On completion of cleaning, follow the above steps in the reverse 

order to refit all removed parts.

 

 

9

Tighten the bolts (7), proceeding diagonally around the 

flange to apply pressure uniformly around the seal.

 

 

− Fill the storage cylinder’s DHW (secondary circuit) and 

check that there are no leaks from any of the seals

 

− Check the performance of the storage cylinder.

Содержание RBS 1000 2S

Страница 1: ...cod 20116337 rev 9 05 2022 RBS 200 300 430 550 2S RBS 800 1000 2S RBS 2S EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...lified heating engineer 9If water leaks from the storage cylinder turn off the water supply and contact R s Technical Assistance Service or a qualified heating engineer immediately 9If the product is...

Страница 3: ...FC chlorofluorocarbons a flange is provided for easy cleaning and maintenance of the anti corrosion magnesium anode 4 IDENTIFICATION The R RBS 2S solar heaters can be identified by Data plate This lis...

Страница 4: ...1300 1 38 1 53 1 67 1 89 2 09 2 24 W K Energy class B B B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Upper coil delivery temperatu...

Страница 5: ...n 10 with heater pre heated to the indicated temperature considering an increase of the domestic water temperature of 30 C between inlet and outlet according to EN 12897 Temperature of accumulation ta...

Страница 6: ...tooth open Apply the upper insulation 2 and the upper cover 5 in order to insert the cover exert a light and homogeneous pressure Close the interlocking flaps L completely which were previously left...

Страница 7: ...0 1 33 450 1 33 520 1 33 520 1 40 600 1 40 600 mm DF Flange internal diameter 130 130 130 130 130 130 mm A 171 171 208 207 75 75 mm B 243 253 329 348 289 289 mm C 403 393 427 443 428 421 mm D 598 693...

Страница 8: ...have been bled Make sure that the boiler and solar collectors connect ed to the system shut down correctly when their mains power switches are turned OFF Provided the above checks have been completed...

Страница 9: ...products petrol or triethylene INTERNAL CLEANING Removing and checking the first magnesium anode If the magnesium anode is fitted in the top of the storage cylin der remove the cover 1 and insulation...

Страница 10: ...s too low or too high Check the flow rate of the collector circuit Pressure is too low Check that circuit pressure is approxi mately 3 bar when cold There is lime scale or sludge in the cylinder Check...

Страница 11: ...switch if fitted 19 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heat...

Страница 12: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Отзывы: