background image

 
RIELLO S.p.A.
Via Ing. Pilade Riello, 7
37045 - Legnago (VR)
www.riello.com

 

 

 

The manufacturer strives to continuously improve all products. Appearance, dimensions, technical specifications, standard equipment 
and accessories are therefore liable to modification without notice.

Содержание RBS 1000 2S

Страница 1: ...cod 20116337 rev 9 05 2022 RBS 200 300 430 550 2S RBS 800 1000 2S RBS 2S EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...lified heating engineer 9If water leaks from the storage cylinder turn off the water supply and contact R s Technical Assistance Service or a qualified heating engineer immediately 9If the product is...

Страница 3: ...FC chlorofluorocarbons a flange is provided for easy cleaning and maintenance of the anti corrosion magnesium anode 4 IDENTIFICATION The R RBS 2S solar heaters can be identified by Data plate This lis...

Страница 4: ...1300 1 38 1 53 1 67 1 89 2 09 2 24 W K Energy class B B B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Upper coil delivery temperatu...

Страница 5: ...n 10 with heater pre heated to the indicated temperature considering an increase of the domestic water temperature of 30 C between inlet and outlet according to EN 12897 Temperature of accumulation ta...

Страница 6: ...tooth open Apply the upper insulation 2 and the upper cover 5 in order to insert the cover exert a light and homogeneous pressure Close the interlocking flaps L completely which were previously left...

Страница 7: ...0 1 33 450 1 33 520 1 33 520 1 40 600 1 40 600 mm DF Flange internal diameter 130 130 130 130 130 130 mm A 171 171 208 207 75 75 mm B 243 253 329 348 289 289 mm C 403 393 427 443 428 421 mm D 598 693...

Страница 8: ...have been bled Make sure that the boiler and solar collectors connect ed to the system shut down correctly when their mains power switches are turned OFF Provided the above checks have been completed...

Страница 9: ...products petrol or triethylene INTERNAL CLEANING Removing and checking the first magnesium anode If the magnesium anode is fitted in the top of the storage cylin der remove the cover 1 and insulation...

Страница 10: ...s too low or too high Check the flow rate of the collector circuit Pressure is too low Check that circuit pressure is approxi mately 3 bar when cold There is lime scale or sludge in the cylinder Check...

Страница 11: ...switch if fitted 19 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heat...

Страница 12: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Отзывы: