PUTTINg INTO SERVICE

It is essential to perform the following checks before starting 

up or testing the functioning of the combination cylinder. In 

particular, check that:

 

− The supply cocks in the domestic water circuit are all open

 

− The water connections to the boiler and solar collectors 

have been made correctly

 

− All the pipes in the water circuit have been insulated in 

conformity to relevant standards

 

− The solar collector circuit has been correctly flushed out 

and filled with water-glycol mix, and all air has been bled 

out of the circuit (see the manual for the solar collectors)

 

− Start up the combination cylinder’s auxiliary heating 

boiler (if installed) as instructed in its own manual

 

− Put the solar collectors into service. See the manuals for 

the solar collectors and associated accessories.

 

9

The domestic hot water tank must be filled and pressurised 

before the buffer tank is filled.

Once the system has been started up, perform the following 

checks.

 

− Make sure that all pumps are free and rotate in the right 

direction

 

− Make sure that all circuits have been bled.

 

− Make sure that the boiler and solar collectors connected 

to the system shut down correctly when their mains 

power switches are turned OFF.

Provided the above checks have been completed satisfactorily, 

restart the system and verify its performance.

15 

TEMPORARY SHUTDOWN

If you are going away for a short period of time like a weekend 

or a short holiday, etc., and outdoor temperatures are going to 

remain above ZERO, proceed as follows.

 

− Adjust the combination storage cylinder’s thermostat to 

its minimum setting.

 

9

If outdoor temperature may drop below ZERO (risk of 

freezing) perform the operations described in the “Preparing 

for extended periods of disuse” section.

16 

PREPARINg FOR EXTENDED PERIODS OF DISUSE

If the combination storage cylinder is not going to be used for an 

extended period of time, prepare it for shut-down as follows:

 

− Switch the electricity supply to the storage cylinder and to 

any associated boiler OFF at the main switch and at the 

control panel (if present)

 

− Close the shut-off cocks for the domestic hot water circuit.

 

9

Drain the central heating circuit and domestic hot water 

circuit if there is any risk of freezing.

17 

MAINTENANCE

Scheduled maintenance is essential for the safety, efficiency and 

long working life of your combination storage cylinder. Proper 

maintenance also reduces energy consumption and ensures 

reliability over time. Have your combination storage cylinder 

serviced either by the manufacturer’s Technical Assistance 

Service or by a qualified heating engineer at least once a year.

Technical Assistance Service

Содержание 7200 Kombi Plus

Страница 1: ...cod 20090482 rev 1 08 2015 7200 Kombi Plus EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...mbination cylinder efficient and cheap to run R service centres also stock any original spare parts that might be required This manual contains important instructions and precautions that must be obse...

Страница 3: ...water system schematics 9 8 Location of sensors 13 9 Overall dimensions and water fittings 14 10 Unpacking the product 15 11 Handling 15 INSTALLER 12 Place of installation 16 13 Installation in older...

Страница 4: ...mains power switch Drain the central heating circuit and domestic hot water circuit if there is any risk of freezing 9 9This instruction manual is an integral part of the product It must be kept safe...

Страница 5: ...e identified by Data plate Thisliststhetechnicalspecifications and performance of the product Product identification plate This states the name of the product bar V Hz l W bar C kW l C kW RIELLO S p A...

Страница 6: ...supplied 11 Insulation 12 Vent valve fitting 13 HT return to boiler 1 HT return to heat pump 14 Boiler temperature sensor socket 15 Flow from boiler 1 Flow from heat pump 16 Auxiliary temperature sens...

Страница 7: ...e surface area 2 10 m2 Continuous domestic hot water production 660 l h Water draw in 10 minutes with mean T of 35 C and primary buffer tank at 80 C 415 l 70 C 340 l 60 C 300 l Maximum operating press...

Страница 8: ...8 GENERAL GENERAL Coil pressure drop PRESSURE DROP mbar 0 0 200 50 100 150 200 250 300 350 400 600 800 1000 1200 1400 1600 550 FLOW RATE l h...

Страница 9: ...Boiler with built in pump 30 Non return valve 31 Pump 32 Plate heat exchanger 33 Laddomat 21 34 Thermal drain valve 35 Biomass fuelled boiler 36 Distribution manifold 37 MIX module 38 Thermostatic val...

Страница 10: ...valve 26 DHW circuit expansion vessel 27 Filter 28 System cocks 29 Boiler with built in pump 30 Distribution manifold 31 MIX module 32 Thermostatic valve 33 Detent 34 Distribution manifold 35 Condensa...

Страница 11: ...4 Safety valve 25 Bleed valve 26 DHW circuit expansion vessel 27 Filter 28 Laddomat 21 29 Thermal drain valve 30 Biomass fuelled boiler 31 Distribution manifold 32 MIX module 33 Thermostatic valve 34...

Страница 12: ...mbi Plus 20 Solar circuit expansion vessel 21 DHW user 22 Isolating valve 23 Thermostatic mixer valve 24 Safety valve 25 Bleed valve 26 DHW circuit expansion vessel 27 Filter 28 Heat pump with integra...

Страница 13: ...rmity to all applicable legislation 9 9Circuits filled with anti freeze must be fitted with water disconnectors 8 Location of sensors R 7200 Kombi Plus combination storage cylinders incorporate socket...

Страница 14: ...rom boiler 2 1 1 4 F MI Central heating flow 1 1 4 F RC1 BT LT return to boiler 1 1 1 4 F RI BT SB LT central heating return 1 1 4 F Inertial storage cylinder drain RI AT HT central heating return 1 1...

Страница 15: ...lift and move the combination cylinder Remove the brackets 1 to free the combination cylinder from the pallet 1 1 1 Proceed as follows to remove the combination cylinder from the pallet Place a platf...

Страница 16: ...in older systems and systems requiring modernisation When installing R 7200 Kombi Plus combination storage cylinders in old systems or systems requiring modernisation always perform the following chec...

Страница 17: ...er switches are turned OFF Provided the above checks have been completed satisfactorily restart the system and verify its performance 15 Temporary shutdown If you are going away for a short period of...

Страница 18: ...petrol or triethylene INTERNAL CLEANING Unscrew the fixing screws then remove the flange insulation 1 and the flange covers 2 Use a wrench to unscrew the bolts 3 fixing the flange 4 in place and remov...

Страница 19: ...emperature setting There is air in the primary circuit Bleed the circuit SOLAR COLLECTOR CIRCUIT FAULT CAUSE SOLUTION The buffer tank functions incorrectly or irregularly There is air in the circuit B...

Страница 20: ...the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the combination storage cylinder s temperature c...

Страница 21: ...21 END USER END USER...

Страница 22: ...22 END USER END USER...

Страница 23: ...23 END USER END USER...

Страница 24: ...el 0442630111 Fax 044222378 www riello it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore...

Отзывы: