
29
20162733
GB
Installation
5.13.1 Supply cables and external connections
passage
All the cables to be connected to the burner must be threaded
through cable grommets. The use of the cable grommets can
take various forms; by way of example see Fig. 23.
Key (Fig. 23)
1
Electrical supply - Bore for M32
2
Consents and safety devices - Bore for M20
3
Minimum gas pressure switch - Bore for M20
4
VPS gas valve leak detection control kit- Bore for M20
5
Gas train - Bore for M20
6
Available - Bore for M20
7
Available - Bore for M16
Cable grommets used in the factory:
A Fan motor
B Maximum gas pressure switch
C ServomotorS
D Rpm sensor
After carrying out maintenance, cleaning or
checking operations, reassemble the cover and
all the safety and protection devices of the burner.
Fig. 23
20165369
Содержание 20162652
Страница 2: ...Translation of the original instructions...
Страница 45: ...43 20162733 GB Appendix Electrical panel layout...
Страница 46: ...20162733 44 GB Appendix Electrical panel layout 0 1 1 2 1 2 3 1 4 1 2 1 2 2 1 1 1 1 1 51 5 5 1 1 2 3 1 2...
Страница 48: ...20162733 46 GB Appendix Electrical panel layout...
Страница 49: ...47 20162733 GB Appendix Electrical panel layout...
Страница 50: ...20162733 48 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 0 0 0 1 0...
Страница 51: ...49 20162733 GB Appendix Electrical panel layout 0 0 0 1 1 1 2 1 3 1 1 1 1 1 1 1 41 4 4 1 1 2 1...
Страница 52: ...20162733 50 GB Appendix Electrical panel layout 0 1 0 1 0 2 0 3 0 0 0 0 0 10 1 0 40 4 4 1 0 0 2 0 5...
Страница 55: ...53 20162733 GB Appendix Electrical panel layout 0 1 1 1 1 1 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 0 2 3...
Страница 57: ......
Страница 58: ......
Страница 59: ......