20163413
18
GB
Installation
5.7
Securing the burner to the boiler
Fit the heat insulation supplied onto the blast tube
4)(Fig. 15).
Fit the entire burner onto the boiler hole prepared previously
(Fig. 14 on page 17), and fasten with the screws supplied.
5.8
Access to head internal part
Unhook the tie-rod 1)(Fig. 16) of the gas butterfly valve
movement lever, removing the nut.
Disconnect the socket 2) of the gas pressure switch.
Remove the 4 fixing screws 3).
Open the burner on the hinge as in Fig. 16.
Unhook the probe cables and electrode 4).
Turn the underneath part of the elbow 5) anticlockwise up to
release it from its housing.
Undo the screw 6) with pressure test point.
Remove the internal part of the head 7).
5.9
Probe-electrode position
Prepare a suitable lifting system using rings
3)(Fig. 15).
WARNING
The seal between burner and boiler must be
airtight.
Fig. 15
1
1
2
5
3
4
3
20162054
Fig. 16
1
2
4
5
7
3
6
20162059
WARNING
Check that the probe and the electrode are placed
as in Fig. 17, according to the dimensions indicat-
ed.
Fig. 17
Probe
Electrode
8
1 8 . 5
20162129
Содержание 20155875
Страница 2: ...Translation of the original instructions...
Страница 43: ...41 20163413 GB Appendix Electrical panel layout...
Страница 44: ...20163413 42 GB Appendix Electrical panel layout 0 0 1 0 1 2 0 3 0 1 0 1 1 0 0 0 0 0 40 4 4 0 0 1 2 0 1...
Страница 45: ...43 20163413 GB Appendix Electrical panel layout 0...
Страница 47: ...45 20163413 GB Appendix Electrical panel layout 0 0 1 2 2 2 2 2 2 2 0 0 2 0 2 0 1 2...
Страница 48: ...20163413 46 GB Appendix Electrical panel layout 0 1 2 1 3 4 56 4 6 4 6 5 4 786 9 3 1 2 78 0 0 2 2 2...