![Riedex DM-200 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/riedex/dm-200/dm-200_user-manual_1459187009.webp)
9
Lifting bracket
D
M
-300
Ventilator
1
3
2
1
0
3230
Hebeb
ügel (2 Stk)
254
5
Befestigungspunkte
Hebeb
ügel
Filterschläuche
Reinigungsmotor bzw
370
20
0
Anschraubbeine
Ansaugstutzen
Sp
änebehälter (3 Stk)
Hebel
Sichtfenster F
üllstand
Typenbezeichnung
Reinluftaustritt
Schaltschrank
Lenkrollen
Typenschild
Sichtfenster
Drehrichtung
Feuerl
ôschung (3 Stk)
R
ȕckschlagklappe
Druckluftbehälter (3 Stk)
min 200 ȕ
ber austritt
d
EscrIptIon
of
thE
machInE
I
nstallatIon
2.1
ARRIVAL
The machine must be checked immedi-
ately upon arrival! For transport damage
or missing parts you must immediately
submit a written claim to the carrier and
document the damage. Inform your
supplier immediately!
TRANSPORT
The extraction unit is supplied fully as-
sembled. The shipment will be on a pallet
and the machine can be unloaded with a
forklift. The device can be removed from
the pallet by means of the lifting eyes
(with forklift or crane).
The mounted swivel wheels make it pos-
sible to move the extraction unit to the
work location. In order to subsequently
position the extraction unit securely on a
level surface, 2 of the wheels are braked.
PLACEMENT
Placing of the dust extractor is prepared as follows:
• Remove the packaging
• Place a plastic bag in the waste container
• Fold the plastic bag over the edges of the waste container.
• The waste container is then driven between the guide rails under the extraction unit
up to the stop. When the waste container is subsequently closed upwards, it is sealed
airtight on the bottom of the extraction unit.
• The extraction unit is supplied with a 5-pole CEE phase exchanger, the electrical con-
nection must be made according to the locally applicable standards.
• Only operate the extraction system on a flat surface.
• The free height above the return air outlet must be at least 200 mm.