![Riedex DM-200 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/riedex/dm-200/dm-200_user-manual_1459187025.webp)
25
a
nnEx
2: p
nEumatIc
schEdulE
comprEssEd
aIr
clEanIng
Pneumatic schedule compressed air cleaning (only for DM-250/P)
Compressed air tank
Contents:
9,4
liter
Max. Boundary pressure:
8 bar
Operational pressure:
6 bar
Depressurizing compressed air cleaning
1. Close the ball valve.
2. Loosen the vent screw until compressed air escapes.
3. When the pressure gauge is at 0 and no more compressed air
escapes, the system (tank, valve and pipe) is completely empty.
4. Close the vent screw.
Pos.
Item no.
Pce. Description
001
F200.001
1
Compressed air tank
002
F200.002
2
C25DD 1" 224 VD MECAIR solenoid valve
003
F200.003
1
NL G½" filter pressure regulator with
pressure gauge
004
F200.004
1
Ball valve ½"
005
F200.005
1
½" brass check valve
006
F200.006
Nylon hose 6 mm