2. Installation
Installation Requirements
Environment/Power Requirements
Operating temperature
5ºC to 40ºC / 41°F to 104°F
• The temperature displayed in “System Temperature” in “Information” in “OPTION” in the OSD
menu indicates the temperature inside the enclosure, so it is not a problem even if it exceeds 40°C
(104°F).
Power supply
100 to 240VAC ± 10%, 50 to 60Hz (Auto-ranging and power factor correction)
Machine Space Requirements
Do not block projector in/out air vents. Keep 30 cm clearance around vents for air flow. Leave a space
of 100 cm or more between the projectors if they are installed side by side.
Machine Dimensions
484 mm (W) x 525 mm (D) x 186 mm (H) (without lens, elevators)
29
Содержание LU6000
Страница 2: ......
Страница 10: ...Projection Light 145 Light 145 8 ...
Страница 28: ...Block Diagram 1 Product Information 26 ...
Страница 29: ...Block Diagram 27 ...
Страница 30: ...1 Product Information 28 ...
Страница 44: ...4 Front Cover A x6 5 Front IR Sensor A 2 hooks 3 Replacement 42 ...
Страница 46: ...4 Left Cover A x6 Right Cover 1 Top Cover page 38 Top Cover 3 Replacement 44 ...
Страница 51: ...3 LAN Board A x3 x2 There are 2 connectors A at the back side Part Replacement 49 ...
Страница 67: ...4 Fan Bracket A x2 5 Fan 3 A Fan 4 Fan 4 A is located next to the heat sink B Part Replacement 65 ...
Страница 69: ...4 Fan Bracket A x3 5 Fan 4 A x2 Fan 5 1 Right Cover page 44 Right Cover Part Replacement 67 ...
Страница 70: ...2 Fan Bracket A x4 3 Fan 5 A x6 LD Driver Board PSU Thermal Pad 1 Bottom Shielding A x6 3 Replacement 68 ...
Страница 71: ...2 Bracket A x6 3 Horizontal Motor with bracket A x2 4 LD Driver Board Casing A x3 x4 Part Replacement 69 ...
Страница 78: ...3 Replacement 76 ...
Страница 100: ...When the calibration has finished a message appears 4 Adjustment 98 ...
Страница 104: ...2 Select OPTION Information 3 Check the serial number 4 Adjustment 102 ...
Страница 106: ...2 Select Factory Reset 3 Select Yes and then press the Enter key 4 Adjustment 104 ...
Страница 116: ...5 Troubleshooting 114 ...
Страница 127: ...3 Cancel selection of the proxy server as shown below and then click OK Network Test 125 ...
Страница 128: ...6 Test Inspection 126 ...
Страница 146: ...Cooling System Location of fans 8 Detailed Description 144 ...
Страница 148: ... Blue laser light is used for the Blu ray Disc laser light source and optical receivers 8 Detailed Description 146 ...
Страница 149: ...MEMO 147 ...
Страница 150: ...MEMO 148 EN ...