Preparation for installation 3-6
II
L
00
(14) Put the two Timing Belts (short and long) to the three RTN Feed Roller (S) Assemblies and
the two RTN Feed Roller (SGP) Assemblies.
(15) Fasten the Tension Roller Assemblies and Tension Pulley (G) Assemblies with the three
screws(M4x12) loosely.
(16) Fasten the two screws (M4x16) from front side of Stacker.
(17) Hang the two Extension springs(short) between the two Tension Pulley (G) Assemblies and
the two screw(M4x16).
(18) Fasten the Tension Roller Assemblies and Tension Pulley (G) Assemblies with the three
screws(M4x12) firmly.
(19) Fasten the two PF Out (2) Motors with six washers and six screws (M4x12).
PF Out (2) Motor
(Large Motor)
Washer (6pcs)
Screw (M4x12)(6pcs)
PF Out (2) Motor
(Small Motor)
Screw (M4x12)
Timing Belt (long)
Timing Belt (short)
Tension Pulley (G) Assembly
Tension Roller Assembly (Roller without teeth)
Extension spring (short)
Screw (M4x16) from front side of Stacker
Содержание EMP 156
Страница 1: ...Transit Pass Unit Type156 Installation Manual 2006 Ricoh Printing Systems Ltd Sep 2006 N904131...
Страница 2: ......
Страница 5: ...BLANK...