Unpacking 1-1
II
L
00
Chapter 1. Installation Requirements
1.1 Application
These specifications are applicable to the Transit Pass Unit Type156, installation and
adjustment.
1.2 Installation Area
Installation area is shown in Appendix 1.
Keep space at the rear of the
Transit Pass Unit Type156
for ventilation.
Otherwise, cooling of the equipment does not done properly and
print Quality may be degraded. (Refer to Figure in the Appendix 1 for
the area of the space.)
1.3 Preparation for installation
Make sure the floor where the leveling bolts to be mounted is strong enough. If the floor is not
strong enough, the equipment may tilts and may cause paper handling problem.
High Capacity
Feeder 2
(Option)
High Capacity
Feeder 1
(Option)
Jack screw
and Caster
Area (
Φ
95)
Jack Screw
Caster Rotation
Area (
Φ
82)
Caster Rotation
Area (
Φ
100)
Intake Hole For
AC Cable
Exhaust Hole
Additional
Stacker
(Option)
Standard
Stacker
Print Engine
With Controller
WARNING
Transit Pass
Unit Type156
(Option)
01
Содержание EMP 156
Страница 1: ...Transit Pass Unit Type156 Installation Manual 2006 Ricoh Printing Systems Ltd Sep 2006 N904131...
Страница 2: ......
Страница 5: ...BLANK...