background image

Unpacking 2-2

II

L

00

2.1.2 Unpacking Procedures

1)  Cut Bands and remove Cap.
2)  Remove the Parts Box.(The Installation Manual is on the Box)
3)  Remove Corrugated Paper Sleeve.
4)  Remove Upper Pad (4pcs.), Corner Pad (4pcs.).,
5)  Remove gummed tape and vinyl.
6)  Remove the Slope Board and tapes on the Under Tray.

7) 

Remove the Installation Manual on the Parts Box and unpack the Parts Box.

 
 

Vinyl

Corner pad

Upper pad

Tape

Gummed Tape

Band

Corrugated paper sleeve

Cap

Parts Box

Installation Manual

Содержание EMP 156

Страница 1: ...Transit Pass Unit Type156 Installation Manual 2006 Ricoh Printing Systems Ltd Sep 2006 N904131...

Страница 2: ......

Страница 3: ...No Contents Date 00 FIRST EDITION May 26 06 01 2 4 2 6 4 2 Addition of the BS PlateAssembly Sep 21 06 4 6 Addition of the Configuration of Post Device Front cover Table Safety2 Safety3 1 1 2 1 2 3 3...

Страница 4: ...handling and operating the Transit Pass Unit Type156 NOTICE TO USER In an effort to meet the demands of a rapidly changing technology the manufacturer is continually developing new features and funct...

Страница 5: ...BLANK...

Страница 6: ...1 2 1 UNPACKING OF THE TRANSIT PASS UNIT TYPE156 2 1 2 1 1 Confirmation of parts quantities 2 1 2 1 2 Unpacking Procedures 2 2 2 1 3 Parts check in the Parts Box 2 4 CHAPTER 3 PREPARATION FOR INSTALL...

Страница 7: ...ates a hazardous situation which if not avoided will or can result in minor or moderate injury or serious damage of product CAUTION Indicates a potentially hazardous situation which if not avoided may...

Страница 8: ...unpacking using the crane or forklift Do not to drop the Transit Pass Unit Type156 hit it against something or turn it over on its side Section 2 1 Page 2 1 Perform unpacking where there is no dust or...

Страница 9: ...s Unit Type156 15 deg or more Section 2 1 Page 2 1 Choose the route to move the Transit Pass Unit Type156 where the slope is less than 15 deg Section2 1 age 2 1 Do not push in the direction of the arr...

Страница 10: ...ay be degraded Refer to Figure in the Appendix 1 for the area of the space 1 3 Preparation for installation Make sure the floor where the leveling bolts to be mounted is strong enough If the floor is...

Страница 11: ...of level 1 5 Environmental Conditions Table 1 2 Environmental Conditions Temperature Humidity Operation 16 32 deg C 60 8 89 6 deg F 20 80 RH Wet Bulb 26 deg C 78 8 deg F max Recommended condition 19 2...

Страница 12: ...t Pass Unit Type156 on unleveled floor Do not tilt the Transit Pass Unit Type156 15 deg or more 4 Choose the route to move the Transit Pass Unit Type156 where the slop is less than 15 deg 5 Do not pus...

Страница 13: ...Remove Corrugated Paper Sleeve 4 Remove Upper Pad 4pcs Corner Pad 4pcs 5 Remove gummed tape and vinyl 6 Remove the Slope Board and tapes on the Under Tray 7 Remove the Installation Manual on the Part...

Страница 14: ...d take out the Slope Pad from Long Box 9 Put the Slope Pad next to the Under Tray 10 Use the Slope Board and unload the Pass Unit from the Under Tray on the floor Long Box Parts Box Pass Unit Slope Bo...

Страница 15: ...nd remove the tape from the parts Parts Box Paper Guide ADD Assembly Paper Guide BufferAssembly FTU Docking BracketAssembly BS PlateAssembly Side Cover ST W Assembly Washer 12 pcs Stand Pin 6 pcs Pres...

Страница 16: ...r PHR Assembly 3pcs B B Holder H 5pcs Carbon Electrode 5pcs RTN Feed Roller SGP Assembly 2pcs RTN Feed Roller S Assembly 3pcs Extension Spring short 2pcs Timing Belt short 1pcs Timing Belt long 1pcs J...

Страница 17: ...Spring 2 Short 12 GND Plate Holder PHR Assembly 3 13 Paper Guide BufferAssembly 1 14 Paper Guide ADD Assembly 1 15 Extension Spring 3 Long 16 Side Cover ST W Assembly 1 17 FTU Docking BracketAssembly...

Страница 18: ...Preparation for Installation of the Pass Unit 1 Remove the tapes on the outside of the Pass Unit according to the following photo 2 Open the Front cover of the Pass Unit 3 Remove the tape on Paper Gu...

Страница 19: ...Docking BracketAssembly 6 Fasten the FTU Docking Bracket Assembly on the bottom of the Pass Unit with the three screws and the three washers which were installed the FTU Docking BracketAssembly 7 Uns...

Страница 20: ...e Side Cover RH 3 Open the Front Cover SL and Front Cover ADP 4 Unscrew the four screws to remove the Front Cover SR Assembly 5 Unscrew the two screws to open the PK BoxAssembly 6 Unscrew the four scr...

Страница 21: ...00 7 Unscrew the four screws to remove the two FD Cover Supports and two FD Cover Bands 8 Unscrew the nine screws to remove the Top Board H Front Cover ADP FD Cover Band Screw 4pcs FD Cover Support F...

Страница 22: ...12 Fasten the three RTN Feed Roller S Assemblies and B B Holder H with six screws M4x12 13 Put the five Carbon Electrodes on the three RTN Feed Roller S Assemblies and the two RTN Feed Roller SGP Ass...

Страница 23: ...the two Extension springs short between the two Tension Pulley G Assemblies and the two screw M4x16 18 Fasten the Tension RollerAssemblies and Tension Pulley G Assemblies with the three screws M4x12...

Страница 24: ...D Plate Holders PHR Assemblies with the three screws M4x8 21 Fasten the Paper Guide BufferAssembly with two screws M4x8 Screw M4x8 GND Plate Holder PHR Assembly Paper Guide BufferAssembly Hole for pos...

Страница 25: ...h four screws M4x8 24 Hook the three Extension springs long between the Paper Guide ADD Assembly and the frame of the Stacker 25 Fasten the screw for the Ground cable Paper Guide ADD Assembly Hole for...

Страница 26: ...six screws M4x12 31 Fasten the Side Cover ST to the right side of the Frame with the two screws which were removed in the Item 3 2 2 32 According to the reverse order of Item 3 2 5 3 2 6 fasten the tw...

Страница 27: ...tion of Transit Pass Unit Type156 1 Connect the Pass Unit to right side of the Stacker while fitting the adjustment pin of the Pass Unit into the hole of the stacker 1 2 Jack screw Pass Unit Stacker C...

Страница 28: ...loor Refer to the drawing of previous page 5 Fasten the BS plate Assembly with a screw M3x6 Only when connecting the Bourg Sheet Rotator to the side of the Pass Unit M5x12 HEX Socket Bolt and Washer F...

Страница 29: ...the CPHP CableAssembly in the Stacker as shown below Use the Cable Clamps which were installed and use the bands which unpacked which were by item 2 1 3 Cable Clamp Cable Clamp Cable Clamp Upper Hole...

Страница 30: ...le from the Pass Unit 5 Pass the Ground Cable from the lower hole of the Stacker 6 Remove M5 screw and washer fasten the Ground Cable with the M5 screw and the washer 7 Connect the DFAInterface Cable...

Страница 31: ...following procedure adjust the height of Pass Unit 1 As shown in Fig 1 leveling height is adjusted so that an eye mark can be seen in a slit 2 Confirm the level of the Pass Unit with the level turn t...

Страница 32: ...en installation process 4 5 Configuration of Post Device It is necessary to define post device configuration for Sheet Rotator and Cover Feeder before using Post Device It can be selected Installed or...

Страница 33: ...1 Installation Area Information MaintenanceArea Printer installation area information Jack screw Caster Caster Floor cut Area Floor panel Unit outline Door Drawer track Maintenance area Front side Un...

Отзывы: