
1.7 CONFIGURATION OF THE DHW PRIORITY SCHEDULE
7RDFFHVVWKHFRQ¿JXUDWLRQSDUDPHWHUVLQVHUWSDVVZRUG
1.8 CONFIGURATION OF THE ANTI-LEGIONELLA FUNCTION
7RDFFHVVWKHFRQ¿JXUDWLRQSDUDPHWHUVLQVHUWSDVVZRUG
In detail:
• CYCA
: Number of consecutive days, without any anti-legionella treatment, after which point a forced treatment is run.
• SEtA
: Temperature in the storage tank, above which the anti-legionella treatment is considered as having been carried out (par.112 > par.134).
• tiMA
: Minimum continuous time, that the above condition lasts for (par.112 > par.134), after which point the anti-legionella treatment is conside-
red as having been carried out.
• HOUA
: Time of day that the forced treatment is carried out.
Forced treatment means switching on the electric resistor, so that par.112 > par.134, for an amount of time equal to par.135.
2EYLRXVO\LIGXULQJQRUPDORSHUDWLRQERWKFRQGLWLRQVUHTXLUHGIRUWKHDQWLOHJLRQHOODWUHDWPHQWDUHIXO¿OOHGWKHQXPEHURIGD\VFRXQWHGZLWKRXWDQ\
treatment starts from zero again.
Menù
label
Par
Label
Description
U.m.
Range
Correct
Address
min
max
Default t
SAm1
124
OmP
Start DHW priority period:
The time of day that DHW production has priority over air conditio-
ning
h:
min
00:00 23:59
00:00
16397
125
OFFP
End DHW priority period:
The time of day until DHW production has priority over air conditio-
ning
h:
min
00:00 23:59
23:59
16398
Menù
label
Par
Label
Description
U.m.
Range
Correct
Address
min
max
Default t
SAni
133
CYCA
DHW heat treatment start frequency (anti-legionella)
The time interval, in days, that the anti-legionella treatment will be
carried out at. At 0, the function is disabled
day
0
30
0
16405
134
SEtA
DHW heat treatment set point (anti-legionella)
°C
50
70
60
16406
135
tiMA
DHW heat treatment start period (anti-legionella) The minimum
continuous amount of time that the water temperature in the storage
tank stays above the set point value
min
1
30
15
16407
136
HOUA
DHW heat treatment start time (anti-legionella)
h:
min
00:00 23:59
02:00
16408
,IWKHVHSDUDPHWHUVDUHQRWFRQ¿JXUHGGRPHVWLFKRWZDWHUSURGXFWLRQZLOODOZD\VKDYHSULRULW\RYHUDLUFRQGLWLRQLQJ
300
Enclosed documents
EN
Содержание ELECTA Series
Страница 40: ...Connessioni sulla TERMINAL BLOCK KEAP 40 Sezione II Installazione e manutenzione IT ...
Страница 95: ...Connections on the TERMINAL BLOCK KEAP 95 Section II Installation and maintenance EN ...
Страница 151: ...Connexions sur la TERMINAL BLOCK KEAP 151 Section II Installation et entretien FR ...
Страница 207: ...Anschlüsse an den TERMINAL BLOCK KEAP 207 Leitungsquersch II Installation und Wartung DE ...
Страница 263: ...Conexiones en la TERMINAL BLOCK KEAP 263 Sección II Instalación y mantenimiento ES ...
Страница 342: ...342 ...
Страница 343: ...343 ...