Below is the recorded cycle
PS08_00002.dko
opened by Notepad (is installed in every PC).
Using the Notepad program the file can be seen in text format. (
Temp1:= controlling temperature sensor;
Temp2: = verifying temperature sensor; Pres1: = controlling pressure sensor
Cycle report
Owner: Franke
Machine: Deko 190 LC
Serial number: PS08
Cycle Name: NORMAL
Cycle number: 2
Cycle Start Time: 17/11/2010 08:03:39
Time:
Temp1:
Temp2:
Press1:
Cold water flush start
-08:03:54 47
46
0.00
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:04:08 47
47
1.07
Cold water flush end
-08:04:15 44
43
0.00
Warm water flush start
-08:04:20 43
43
0.00
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:04:44 43
42
0.83
Warm water flush end
-08:04:51 40
39
0.00
Circulation wash start
-08:04:53 40
39
0.00
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:05:41 48
48
0.98
Chem set 45ml
T: 48C p:0.99bar
-08:05:45 48
48
0.99
-08:05:48 48
48
0.97
-08:05:50 48
48
0.97
Chem flow OK
-08:05:54 49
48
0.97
-08:05:56 49
48
0.96
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:07:32 49
49
0.92
-08:07:36 49
49
0.94
Circulation wash end
T: 49C p:0.99bar
-08:07:39 49
49
0.01
-08:07:42 49
49
0.00
-08:07:44 49
49
0.01
Hot water rinse start
-08:07:50 49
49
0.01
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:08:33 56
55
0.93
-08:08:35 56
56
0.93
Hot water rinse end
T: 56C p:0.93bar
-08:08:41 56
56
0.07
Disinfection 90 C start
-08:08:48 56
56
0.01
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:12:26 92
93
0.01
Temperature attained:
T: 93C
-08:12:33 94
94
0.01
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:13:26 94
94
0.01
Disinfection end
T: 94 °C
-08:13:31 94
94
0.00
Disinfection time 60 s
-08:13:33 93
92
0.00
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-08:13:42 86
85
0.01
Cycle end time: 17/11/2010 08:13:43
Cycle pass: OK
Signature
23
Содержание DEKO 190iX
Страница 2: ...2 ...
Страница 10: ...5 1 3 Sequence diagrams Here is a typical curve of DEKO 190 process cycle with main sequences 10 ...
Страница 34: ...34 ...
Страница 35: ...APPENDIX 2 USER INSTRUCTIONS 35 ...
Страница 36: ...36 ...
Страница 38: ...38 ...