![Rheem *96V series Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/rheem/96v-series/96v-series_installation-instructions-manual_1451371017.webp)
Fie
ld C
on
ve
rsio
ns
DRILL
1/8" DRILL BIT
PLIERS
FLAT HEAD SCREWDRIVER
5/16 HEX HEAD DRIVER
1/4" HEX HEAD DRIVER
TUBING CUTTER
TOOLS/MATERIALS NEEDED:
UPFLOW LEFT VENT
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
ST-A1194-29-03
PARTS NEEDED:
(X2)
FROM PARTS BAG (PROVIDED W/UNIT)
INTAKE
COUPLING
W/ NUT
BULKHEAD
COUPLING
#8 X 1/2"
SCREW
TUBE C
HOSE
CLAMP
4
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
3
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE.
REMOVE PLUG - DISCARD.
DRILL (2)
ø
1/8" HOLES FOR THE BULKHEAD COUPLING.
DRILL 1/8”
DISCARD
OPTION DRAIN RIGHT
DRILL 1/8”
DISCARD
OPTION DRAIN LEFT
2
2a - INSTALL 2-5/8" FLUSH MOUNT PLUG IN TOP PLATE.
2b - INSTALL 2" PIPE GROMMET AS SHOWN.
2c - INSTALL INTAKE COUPLING AS SHOWN.
2b
2c
2a
2-5/8”
1a
1b
1c
1
1a - REMOVE FLUE TRANSITION, TRANSITION COUPLING, AND ELBOW.
(NOTE: REMOVE INDUCER COUPLING W/ELBOW FOR EASIER REMOVAL).
1b - REMOVE 3-3/8" FLUSH MOUNT PLUG FROM JACKET - DISCARD.
1c - RELOCATE 2-3/8" FLUSH MOUNT PLUG FROM JACKET TO TOP PLATE.
RE
-LO
CA
TE
DISCARD
IDB COUPLING
(RETAIN)
FLUE TRANSITION
(DISCARD)
TRANSITION
COUPLING
(DISCARD)
ELBOW
(DISCARD)
FROM CONVERSION KIT RXGY-CK
2-3/8" PIPE
GROMMET
2-5/8" FLUSH
MOUNT PLUG
PARTS NEEDED FOR THIS
CONVERSION REQUIRE THE
OUTLINED ITEMS FROM THE
PARTS BAG
AND CONVERSION KIT
RXGY-CK.
YOU
MUST HAVE THESE PARTS BEFORE
PROCEEDING.
!
"
*
3
'
-
0
8
IF THE IDB
COUPLING IS
REMOVED, IT
MUST BE
REPLACED IN
THE PROPER
ORIENTATION.
AN ARROW IS
PRESENT ON
THE COUPLING
TO INDICATE
THE DIRECTION
OF EXHAUST
FLOW. MAKE
SURE THE
ARROW POINTS
IN THE
CORRECT
DIRECTION.
NOTE:
(X3)
HOSE -
DOUBLE
ELBOW
SEE CRITICAL HOSE CLAMP LOCATION NOTE
IN THE GENERAL COVERSION INSTRUCTIONS.
17
Содержание *96V series
Страница 34: ...Field Conversions 34...
Страница 35: ...Field Conversions 35...
Страница 36: ...36 Field Conversions...
Страница 37: ...37 Field Conversions...
Страница 38: ...Field Conversions 38...
Страница 81: ...81 TABLE 14 SUPPLEMENTAL ORIFICE SIZE CHART HIGH ALTITUDE NATURAL GAS AT HIGH ALTITUDES cont High Altitude...
Страница 112: ...112 Diagnostics TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS...
Страница 117: ...117 TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS Diagnostics...
Страница 123: ...123 FIGURE 62 2 STAGE ECM FURNACE WIRING DIAGRAM Troubleshooting...
Страница 124: ...124 CM 1014...