Fie
ld C
on
ve
rsio
ns
ST-A1194-35-01
Notes:
Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW.
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE FLUE TRANSITION
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ ALL DRAIN PORTS ARE PLUGGED.
__ UNIT HAS FORWARD PITCH.
__ HEAT TAPE INSTALLED(IF REQUIRED)
41
Содержание 96MDV Series
Страница 34: ...Field Conversions 34...
Страница 35: ...Field Conversions 35...
Страница 36: ...36 Field Conversions...
Страница 37: ...37 Field Conversions...
Страница 38: ...Field Conversions 38...
Страница 81: ...81 TABLE 14 SUPPLEMENTAL ORIFICE SIZE CHART HIGH ALTITUDE NATURAL GAS AT HIGH ALTITUDES cont High Altitude...
Страница 115: ...115 TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS Diagnostics...
Страница 120: ...120 Diagnostics TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS...
Страница 126: ...126 FIGURE 65 2 STAGE ECM FURNACE WIRING DIAGRAM Troubleshooting...
Страница 127: ...127...
Страница 128: ...128 CM 1015...