Fi
el
d
Co
nv
er
sio
ns
22
ST-A1194-30-02
Notes:
Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ ALL DRAIN PORTS ARE PLUGGED
__ UNIT HAS FORWARD PITCH
__ HEAT TAPE INSTALLED(IF REQUIRED)
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ DOUBLE CHECK DIFFUSER IS INSTALLED IN INTAKE COUPLING
Содержание 96MDV Series
Страница 34: ...Field Conversions 34...
Страница 35: ...Field Conversions 35...
Страница 36: ...36 Field Conversions...
Страница 37: ...37 Field Conversions...
Страница 38: ...Field Conversions 38...
Страница 81: ...81 TABLE 14 SUPPLEMENTAL ORIFICE SIZE CHART HIGH ALTITUDE NATURAL GAS AT HIGH ALTITUDES cont High Altitude...
Страница 115: ...115 TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS Diagnostics...
Страница 120: ...120 Diagnostics TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS...
Страница 126: ...126 FIGURE 65 2 STAGE ECM FURNACE WIRING DIAGRAM Troubleshooting...
Страница 127: ...127...
Страница 128: ...128 CM 1015...