Fie
ld C
on
ve
rsio
ns
TUBE C
CUT TO FIT
CABINET WIDTH
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
4B
4b - RIGHT SIDE DRAIN OPTION
4b1 - CUT TUBE “C” TO FIT CORRESPONDING CABINET WIDTH.
4b2 - INSERT TUBE “C” INTO END “2” OF HOSE- DOUBLE ELBOW
4b3 - SLIDE TWO WIRE CLAMPS OVER TUBE “C”, SLIDE ONE WIRE CLAMP OVER
END “1” OF HOSE - DOUBLE ELBOW.
4b4 - INSTALL TUBE “C” WITH HOSE CLAMP AS SHOWN TO HOSE “A” “PRE ASSEMBLED”.
4b5 - ATTACH HOSE - DOUBLE ELBOW TO BULKHEAD COUPLING POSITION WIRE HOSE
CLAMP.
HOSE A
TUBE C
4A
HOSE A
4a - LEFT SIDE DRAIN OPTION
ATTACH HOSE A (PRE-INSTALLED) TO BULKHEAD COUPLING.
INSTALL HOSE CLAMP ON HOSE OVER BULK HEAD COUPLING.
3
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
INSTALL
2
OPTION DRAIN RIGHT
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE.
REMOVE PLUG - DISCARD.
DRILL (2) Ø 1/8" HOLES FOR THE BULKHEAD COUPLING.
DRILL 1/8”
DRILL 1/8”
7/8” PLUG
DISCARD
OPTION DRAIN LEFT
7/8” PLUG
DISCARD
1
INSTALL INTAKE COUPLING IN TOP PLATE.
INSTALL
UPFLOW VERTICAL VENT
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
ST-A1194-28-03
PARTS NEEDED:
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
FROM THE
PARTS BAG
ONLY. NO OTHER CONVERSION
KITS ARE NEEDED.
!
TUBE C
BULKHEAD
COUPLING
FROM PARTS BAG (PROVIDED WITH UNIT)
(X2)
#8 X 1/2"
SCREW
HOSE
CLAMP
INTAKE
COUPLING
W/ NUT
DRILL
1/8" DRILL BIT
PLIERS
1/4" HEX HEAD DRIVER
TUBING CUTTER
TOOLS/MATERIALS NEEDED:
"
*
3
'
-
0
8
(X3)
(X3)
HOSE -
DOUBLE ELBOW
1
2
HOSE -
DOUBLE ELBOW
15
Содержание 96MDV Series
Страница 34: ...Field Conversions 34...
Страница 35: ...Field Conversions 35...
Страница 36: ...36 Field Conversions...
Страница 37: ...37 Field Conversions...
Страница 38: ...Field Conversions 38...
Страница 81: ...81 TABLE 14 SUPPLEMENTAL ORIFICE SIZE CHART HIGH ALTITUDE NATURAL GAS AT HIGH ALTITUDES cont High Altitude...
Страница 115: ...115 TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS Diagnostics...
Страница 120: ...120 Diagnostics TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS...
Страница 126: ...126 FIGURE 65 2 STAGE ECM FURNACE WIRING DIAGRAM Troubleshooting...
Страница 127: ...127...
Страница 128: ...128 CM 1015...