Page 16 of 22
MAINTENANCE
IMPORTANT
It is a requirement in NSW and may be a requirement in other states that the owner of a Warm Water
system is to register the installation with the local council or regulatory authority.
GENERAL
The maintenance of this product must be carried out in accordance with instructions given in this
Owners Guide, and must be conducted by designated, qualified and competent personnel.
A table is provided in the
Guardian Warm Water Owner’s guide and installation instruction in the
Maintenance Log Sections on pg 24 and 25, which can be copied and used as a template for
recording purposes.
Rheem Service provides a comprehensive maintenance program structured to meet the most
stringent requirements to maintain the product at peak performance and monitor for the
presence of Legionella. Contact your nearest Rheem Service Department or Accredited Service
Agent to arrange a Service Contract inspection
.
Storage of all UV disinfection equipment should be in a clean and dry place
UV MAINTENANCE SCHEDULE
Legionella Sampling
– Unless prescribed by a regulating authority sampling at the following rates is
recommended:
First 3 months - 2 samples, once per month.
Month 6
– 2 samples
6 monthly there after
– 2 samples
The above rates are applicable as long as legionella results are below prescribed limits
6 Monthly Check
-
Check operation of UV, clean quartz tube if necessary
Annually
-
As above and replace O-rings in UV
-
Replace UV lamp