Page 36
Turbulator positions in models 40 - 70. 8 off
Turbulator positions in models 90 - 100. 12 off
4.2.6 Burner
Service requirements for the burner fitted to the unit heater are covered in the separate manual prepared by the
burner manufacturer.
It is most important that the burner is serviced regularly and in accordance with the manufacturers instructions.
4.2.7 Air Delivery System
A visual inspection should be undertaken to ensure that the air delivery system is in good order, that it remains
adequately supported and that the various joints are effectively sealed.
4.2.8 Report
A full and detailed service report should be prepared, it is advised that the report is not completed until the heater has
been re-commissioned, where upon the completed report can then be run through with the user.
4.3 Service Re-commissioning
The heater should be re-commissioned as follows, as per section 3.1 through to section 3.4 inclusive.
This must be regarded as a necessary part of the heater service. By the service engineer.
Содержание OUH 100
Страница 46: ...Page 46 Notes...