- 7 -
4. Setting Up
Replacing the Roller Set (Figs. 5, 6)
Replacing the Main Shaft
ع
Removing the rollers
ع
Installing the rollers
(Apply the above procedures in reverse)
Code No.
Name
Mark
For use with
1"-1
1/2
" Main Shaft
None
1"-1
1/2
"
Table 3 Main Shaft
341141
Main shaft
Main shaft nut
Bolt
Bearing plate
Push
Fig. 8
Fig. 5
Fig. 6
1) Loosen the bolts and turn the safety cover
clockwise. (Figs. 5, 6)
2) Remove the upper roller by loosening the fitting
screws on the upper roller and pulling out the
roller shaft. (Fig. 6)
3) Pull out the lower roller by loosening the
hexagonal nut on the main shaft and removing
the washer. (Fig. 7)
1) Match the key on the roller shaft with the key
groove in the upper roller and firmly lock with the
fitting screw.
2) Insert the lower roller into the main shaft, and
firmly lock with the hexagonal nut.
3) Replace the safety cover and tighten the screws.
* Before setting up, clean the inside surface of the
roller and the shaft of waste. Apply grease to the
entire circumference of the upper roller shaft and
the inside surface of the lower roller.
* Be sure to change the upper/lower rollers as a set.
1) Remove the rollers in the order above.
2) Loosen the fixing screw on the main shaft nut, turn
the nut anti-clockwise and remove from the main
shaft.
3) Press the main shaft and remove from the main
body.
4) Installation: Insert the main shaft into the main
body. Then screw in the main shaft nut as far as it
will go and tighten the fixing screw. Bearing plate,
then tighten it firmly with the 4 bolts.
㧍
CAUTION
㨯
Clean the main shaft thoroughly with a cloth
before setting up.
Avoid letting iron powder or foreign bodies
get inside the main unit, as this will damage
the machine.
Fig. 7
Fixing screw