background image

  BlueLine II Tank                         DORW2046a                    26.08.2013                      4 / 16 

1.4 Hillside situation 

The soil of the area has to be checked for possible soil movement (DIN 1054 edition 
1/2003, E DIN 4084 edition 11/2002) and if necessary it will need to be secured with a 
supporting structure (e.g. a wall).  Further information is available at the local public 
authorities and building enterprises.  

1.5 Further criteria 

Existing pipelines, pipes, vegetation as well as other specifics have to be considered, so 
that damage or hazards will be avoided. The soil coverage from the tank shoulder (point 
4) may not exceed 1.5 m. 

 

2. Installation 

2.1

 

Backfill material

 at the tank (backfill, bedding; point 3 figures 3, 4 and 10) 

The backfill material has to be well compactable and permeable to water, allowing close 
packing and no damage the surface of the tank. If the filling material contains sharp or 
sharp-edged components, the wall of the tank has to be protected by a sandy coating. 

2.1.1

 

Sand - gravel mixtures

 (SW and GW to German Institute for Standardization 

18196 and ENV 1046) are the most favourable filling materials, because they have a 
grain line which consists of several grain sizes with only a low amount of fines (fines: 
under Ø 0,06mm). At the description of the mixtures the first number gives the mesh 
width (simplified Ø) of the smallest grain and the second one those of the biggest grain: 
e.g., 0/32; 2/16; 2/8; 2/32; 4/16. Which mixtures are available, strongly depends on the 
regional gravel plants. 

2.1.2 Concrete gravel, or treated concrete rubble, 

with a particle size of 0/32 mm is 

particularly well suited for use in clay/loam soil conditions with ground water and a high 
water table. When ground water and a high water table are present, it is particularly 
important to ensure good compaction, especially at hard to reach places.    

 

2.1.3

 

Stone Chippings

 - crushed rock particles between 2/32 mm in size and is 

primarily suited as a filling material; however due to its sharp edges, the tank must be 
protected against damage, for example using a sand coating. 

2.1.4

 

Excavation, sand and gravel mixture with mixed particle sizes

 is suitable for 

use as a filling material when it meets the criteria listed under Item 2.1. 

2.1.5

 

Top soil, clay, loam and other types of cohesive soils

 are not suitable filling 

materials.  

2.2

 Filling beyond the backfill 

Excavated soil (point 3 figures 1 and 10) or other material can be used if this is stable 
and permeable. 

2.3 Backfilling and compaction methods 

2.3.1 The backfilling and compaction methods to be used

 are described in Section 

3 (Installation instructions) 

2.3.2 Methods that are not to be used

 include in particular adding water. Adequate 

compaction is not achieved and the mixture of particle sizes combine in such a way that 
the compaction is unstable.    

2.3.3 Base layer (driveable version) 

Range of grain size 2/45 is to be used. 

Содержание BlueLine II 10000

Страница 1: ...BlueLine II Tank DORW2046a 26 08 2013 1 16 Technische Dokumentation Unterirdische Universalspeicher BlueLine II Technical Documentation Underground Container BlueLine II ...

Страница 2: ...ngen Rohre Vegetation sowie andere Besonderheiten sind so zu berücksichtigen dass Beeinträchtigungen und Gefährdungen vermieden werden Die Erdüberdeckung ab Tankschulter Punkt 4 darf maximal 1 5 m betragen 2 Installation 2 1 Verfüllmaterial am Tank Umhüllung Bettung Punkt 3 Bilder 3 4 und 10 Das Verfüllmaterial muss gut verdichtbar und wasserdurchlässig sein eine feste Packung bilden und darf die ...

Страница 3: ...ines angeschlossenen Aggregatraums z B Keller bei über vollem Tank vermieden wird Dieses kann beispielsweise realisiert werden durch ein ausreichend starkes Gefälle der Leitung vom Haus zum Tank Oder die Installation einer Abdichtung 2 4 4 Die Leitungen sind so einzubauen dass Frostsicherheit gewährleistet ist Dieses ist entsprechend den örtlichen klimatischen Verhältnissen gegebenenfalls in Absti...

Страница 4: ...he second one those of the biggest grain e g 0 32 2 16 2 8 2 32 4 16 Which mixtures are available strongly depends on the regional gravel plants 2 1 2 Concrete gravel or treated concrete rubble with a particle size of 0 32 mm is particularly well suited for use in clay loam soil conditions with ground water and a high water table When ground water and a high water table are present it is particula...

Страница 5: ... figure 11 2 4 3 The service pipe is to be installed to prevent any flooding from the tank entering the service room e g cellar if the tank is full This can be achieved for example by a high enough incline of the pipe from the house to the tank Or by the installation of a seal 2 4 4 The pipes have to be installed in such a way that frost damage is avoided This is to be arranged according to the lo...

Страница 6: ...BlueLine II Tank DORW2046a 26 08 2013 6 16 3 Installationsanleitung Installation guide Hinweis auf weitere Informationen in Kapitel Notes for further information in chapter ...

Страница 7: ... 7 16 WICHTIG Zu Beginn des Einbaus nur mit 500L Wasser befüllen dann weiter um den Tank verfüllen siehe nächste Seiten IMPORTANT To start the installation fill the tank only with 500L water Than you may continue backfilling see next pages ...

Страница 8: ...BlueLine II Tank DORW2046a 26 08 2013 8 16 ...

Страница 9: ...BlueLine II Tank DORW2046a 26 08 2013 9 16 ...

Страница 10: ...ndard Anschlussöffnungen Main dimensions and positions of the standard connections A Regenwasserzulauf DN 100 A Connection inflow DN 100 B Versorgungsrohr DN 100 B connection service pipe DN 100 C Überlauf DN 100 C connection overflow DN 100 Höhe Tankschulter height tank shoulder ...

Страница 11: ...W2046a 26 08 2013 11 16 A Regenwasserzulauf DN 100 A Connection inflow DN 100 B Versorgungsrohr DN 100 B connection service pipe DN 100 C Überlauf DN 100 C connection overflow DN 100 Höhe Tankschulter height tank shoulder ...

Страница 12: ...W2046a 26 08 2013 12 16 A Regenwasserzulauf DN 100 A Connection inflow DN 100 B Versorgungsrohr DN 100 B connection service pipe DN 100 C Überlauf DN 100 C connection overflow DN 100 Höhe Tankschulter height tank shoulder ...

Страница 13: ...l diameter 648 and profile according to DIN 19596 Verlängerungsschächte VS 60 und VS 20 durch Zuschneiden kürzbar Extension shafts VS 60 and VS 20 can be shortened by cutting A safety latch opened B safety latch closed A Sicherungsriegel geschlossen B Sicherungsriegel geöffnet Hinweis Bei Zukauf dieses Artikels für die Einbautiefe bitte die entsprechende Einbauanleitung beachten Note When purchasi...

Страница 14: ...en The contents of the technical documentation are a component of the guarantee terms Es sind bei Planung und Einbau die einschlägigen Normen und andere Regelwerke sowie die Unfallverhütungsvorschriften zu beachten Planning and installation regulations are to be followed as well as the accident prevention regulations PKW Komplett Set Car set complete A1 Inspektionsöffnung geschlossen A2 Inspektion...

Страница 15: ...BlueLine II Tank DORW2046a 26 08 2013 15 16 Notizen Notes ...

Страница 16: ...BlueLine II Tank DORW2046a 26 08 2013 16 16 Notizen Notes ...

Отзывы: