background image

WIRE SIZE FOR WIRING

WARNING: forbid to overload operation for a long time!

Power

Heater power [kW]

Main line [mm   ]

2

Earth line 

 

[m  ]

2

SINGLE PHASE ( 230V~, MAIN LINE : L, N)

3

4

5

6

8

10

14

1.5

2.5

2.5

4.0

6.0

10

10

0.75

1.0

1.0

1.5

2.5

2.5

4.0

 3. 

INSTALLATION

3.1. 

GENERAL PRINCIPLES

The following figures show the recommended distances between the air curtain 
and the building partition

:

 

The width of the curtain should be greater or equal to the width of the door frame.  
When the entrance is wider than the unit, it is recommended to install two or more 
units in parallel. In this case, provide 10-40 mm gaps between the units

.

 

3.2. 

ASSEBLY “STEP BY STEP”

The curtain can be assembled on wall or ceiling. If any components are not included 
in the kit, you should buy them   yourself and make sure they are suitable for this 
type of installation

.

a) 

wall mounting

unscrew the fixing screws to remove the mounting plate from the back of the 

main body

install mounting plate on the wall

4.1. 

CONNECTION OF THE DEIVCE TO THE ELECTRICAL SYSTEM

-  all  works  concerning  electrical  installation  should  be  made  by  the  qualified 
personnel (who possess required authorizations to install electrical equipment), 
based on wiring schematic diagrams. (see 7)

the electrical installation of the building shall have a residual current device

check the electrical installation and automation before the first start

5. 

PRECAUTIONS AND WARNINGS

During operation of the device, the following must be respected:

all works concerning electrical installation (disassembly, repair etc.) should be 

made  by  the

 

qualified  personnel,  who  possess  the  qualifications  due  to  the 

domestic and local norms, regarding electrical installations

do not limit or cover the inlet and outlet of the device

do not install, service the device with wet hands or barefoot

the device should be kept out of reach of children and animals

-

when  no  need  heating,  turn  off  the  heat  source  to  use  it  as  an  unheated  air 

curtain

after the turn off, the elements of device may be warm

after operating time of the device, please utilize it concerning the local norms 

and regulations

don’t allow water or any liquid to enter the motor

maintenance  and  repair  work  must  be  carried  out  by  a  qualified  personnel 

familiar with local regulations and standards

always  unplug  or  disconnect  the  appliance  from  the  power  supply  before 

installation, servicing or cleaning the unit

never use petrol, benzene, thinners or any other chemicals for cleaning the unit

periodic maintenance work should be carried out at least once a year by: 

ź

  

cleaning the heater and other elements from dust

ź

 

 

cleaning of plastic parts with water with the addition of soap

ź

  

cleaning the casing with a soft cloth

install the main body. Set the main body onto the upper end of the mounting 

plate and clamp it as shown

4. 

INSTALLATION INSTRUCTIONS 

Отзывы: