Service
76
Operating instructions SVCD(S)
123456278
-
419A58
Elektrotechnische Anlagen GmbH
1
8
Service
The power feedback unit is maintenance-free, if the provided application conditions are
observed (refer to chapter 3.2).
If the cooling air is polluted, the cooling air input may be blocked. Therefore check the
power feedback unit periodically (depending on the degree of pollution approx. every 4
weeks).
Danger!
Don’t use sharp or tapering objects like knife or screw driver to clean the cooling air input.
Clean the cooling air input with a vacuum cleaner.