Commissioning
Operating instructions SVCD(S)
69
123456278
-
419A58
Elektrotechnische Anlagen GmbH
1
5
Commissioning
Danger!
Prior to initial switch-on of the power feedback unit check the wiring for completeness, short-
circuit and earth fault.
Danger!
If the wiring is not correct, a non-intended operation of controller and/or power feedback unit is
possible.
5.1
First powering up
1.
Switch on mains supply :
- The power feedback unit is ready for operation after ca. 1s
2.
Check the readiness for service of the power feedback unit:
– If only the green LED is on:
Power feedback unit is ready for service.
– If beside the green LED also other LED’s are on:
A disturbance is present. Before proceeding with commissioning, remove
the disturbance (refer to chapter 7 "Troubleshooting”).
3.
Check the readiness for service of the controller:
– Proceed in accordance with the controller manual.