First Commissioning
24
Screw both support rods (
E
) into the designated threaded holes (
SB
) in the sieve plate (
ST
)
and lock them with the hexagonal nuts (
G
).
Firmly tighten the hexagonal nuts (
G
) by means of a 19 mm open-end wrench.
Fig. 8:
Installation of the sieve clamping unit "comfort"
including the sample material centrally on the sieve plate (
ST
).
Place the assembled clamping lid on the support rods (
E
) with the quick clamping units
facing upwards.
Lift the red quick clamping levers (
F2
) of both quick clamping units (
F
) for freely sliding the
clamping lid up and down the support rods. Be sure not to push down the green quick
clamping levers when doing so.
Slide the quick clamping units with the clamping lid down the support rods (
E
) onto the top
test sieve.
When the clamping lid is correctly positioned on the sieve stack, press down the green quick
clamping levers (
F1
) 1
– 2 times in order to fix the clamping lid tightly on the sieve stack.
NOTICE
Always use both quick clamping units simultaneously! Do not activate both quick
clamping levers (red and green) of one quick clamping unit at the same time.
To loosen the clamping lid after the sieving process, lift the red quick clamping levers (
F2
).
Keep them lifted and slide the clamping lid upwards until the sieve stack can be removed.
There is no need to take off the clamping lid completely from the support rods.
CAUTION
C7.0012
Contusions and bruises
Overturning of the sieve stack
−
The sieve stack can overturn and cause personal injury.
•
Only operate the device with securely clamped sieve stack.
ST
E
G
SB
Содержание AS 400 control
Страница 2: ...2 Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...
Страница 5: ...Notes on the manual 5...
Страница 49: ......
Страница 50: ...Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...