Retigo vision Скачать руководство пользователя страница 14

MAINTENANCE AND CLEANING

1 2

M A I N T E N A N C E   A N D   C L E A N I N G

Maintenance  and  cleaning  must  be  perfor-

med by qualified personnel only. Maintenan

-

ce  and  cleaning  of  the  heat  exchanger 

should  be  done  when  decrease  of  perfor-

mance occurs, but at least once a year. The   

                grease filters can be cleaned in a dishwa- 

                shing machine.

Disconnect the hood from power supply and let it cool 

down before you start cleaning. 

The cleaning steps:

- Remove the hood from the combi steamer (see picture 

V.) a place it on a suitable working table.

- Remove the grease filters.

- There are 12 M5 screws on the front side of the steam 

trap.  Unscrew  these  screws  with  a  screw  driver  and 

remove the steam trap from the hood – position 1. 

- Unscrew the safety plate and the dividing partition – 

position 2.

- Disconnect the motor power cable connector – pos. 3.

- Remove the heat exchanger – pos. 4 together with the 

motor – pos. 5.

- Remove the metal sheet plate with the motor from the 

exchanger.

The hood description:

Picture V:

1 - Vapor drap

2 - Division partition

3 - Connector

4 - Heat exchanger

5 - Motor

The  RETIGO  Company  recommends  regular  clea-

ning and maintenance of the appliance by a authorized 

service company. Excessive wear and tear and possible 

damage to the appliance can be prevented only by re-

gular checks of the device and its cleaning.

Preventive service check must be performed after one 

year of usage.

Picture VI:

1 - Service openings

Wash all the washable parts (grease filters, steam trap, 

division partition) and the inside of the hood with warm 

water mixed with detergent. 

 

Place the heat exchanger 

to the position depicted in picture II. Insert detergent 

into the exchanger through the three designated ope-

nings (see picture 5.) and leave it there for 15 minutes. 

After that, rinse the exchanger with hot water. Repeat 

this procedure until the exchanger is clean.

  Picture 5 - Service openings

Let all the parts dry and then reassemble them.

Содержание vision

Страница 1: ...Vision VENT Technical documentation RETIGO 2011 ...

Страница 2: ......

Страница 3: ...mited 3 SAFETY INSTRUCTION 5 1 General safety data 5 2 Operating personnel designation 5 3 Perfect condition 5 4 Safety rules for work with the RETIGO Company products 5 TECHNICAL DATA 6 TRANSPORT AND INSTALLATION 7 1 Appliance transportation 7 2 Waste disposal 7 3 The Appliance installation 7 4 Eletrical connections of the air condensation hood 8 5 The hood set up and control 10 MAINTANCE AND CLE...

Страница 4: ...ETIGO hoods are designed for extraction and condensation of vapors emanating from the Vision mo dels of the RETIGO combi steamers They are control led by the combi steamer s electronics After the combi steamer door is shut and prepa ration of food is triggered the temperature inside the cooking chamber is carefully monitored If this tempe rature exceeds the temperature necessary for the hood activ...

Страница 5: ...leaning and maintenance If any steps of the process are unclear to you seek additional infor mation from your deal er or the manufacturer 5 1 Used symbols The symbols we use are designed to signal activi ties which may affect your safety or health They also attempt to help you with preventive checks The good advice symbol s role is to make your work easier Damage Prevention This symbol informs you...

Страница 6: ... and will remove all responsibility for consequent damages from the RETIGO Company Accidental mistakes or omissions are covered within the contractual warranty obligations negotiated in the contract when elimina ting all further claims Any claims for damages no matter the legal rea son applied are not possible ...

Страница 7: ...ation from your dealer or manufacturer by mail or by phone 2 Operating personnel designation Designate a specific person who will operate the appliance and train him or her This device is designed for professional use only and must be operated solely by qualified and properly trained personnel 3 Perfect Condition Operate this appliance only while it is in a perfect condition Do not remove any safe...

Страница 8: ...CHNICAL DATA Bas i c technical parameters Weight 60 kg Dimensions d x w x h 1130 x 930 x 412 mm Noise min max 63 dB 68 dB Airflow max 1000 m3 h Input max 400 W Required voltage 1NN 200V 230V 50 60 Hz 2N 200V 230V 50 60 Hz ...

Страница 9: ...stics 2 2 Liquidation after useful life expiration Please deposit the sheet metal parts to a waste disposal centre for proper liquidation 3 The Appliance Installation 3 1 Preparation for the Appliance Installation Before you start the hood installation please discon nect the combi steamer from the electric sup ply Installation of the hood must be performed in accor dance with all relevant rules an...

Страница 10: ...ackage Start with the two side filters as shown in picture III they are marked with edging and then place the middle filter between them Picture III Grease filters installation 3 3 Check the installation location Make sure that the electrical power supply meets the parameters listed on the manufacturer s label This will prevent possible installation complicati ons 4 Electrical connections of the h...

Страница 11: ...ency converter as seen in picture Nr 3 Pict 3 The bushing in the power panel Connecting the UTP cable Run the control UTP cable from the hood towards the combi steamer s base In the base near the supply cable opening you will find capped holes Break one of them and to this space insert the cable grommet attached to the UTP cable See picture Nr 4 In the combi steamer power panel there is a rubber o...

Страница 12: ... and perform protec ted coupling 5 The hood set up and control In order for the hood to work properly it is necessa ry to allow communication between the hood and the combi steamer in the combi steamer s service menu Setting the hood on the combi steamer s con trol panel Blue Select Service at the combi steamer display then choose PIN click OK in the service menu select the item Configuration then...

Страница 13: ... Solution of the problem Err 62 5 Error or interruption in the data communication between the hood and the combi steamer Power sup ply interruption Check the data hood communication cable and its correct connection Make sure the air condensati on hood is plugged into the power supply Err 63 5 64 5 65 5 66 5 70 5 71 5 72 5 73 5 Data communications error Error or interference of data com munication ...

Страница 14: ...gether with the motor pos 5 Remove the metal sheet plate with the motor from the exchanger The hood description Picture V 1 Vapor drap 2 Division partition 3 Connector 4 Heat exchanger 5 Motor The RETIGO Company recommends regular clea ning and maintenance of the appliance by a authorized service company Excessive wear and tear and possible damage to the appliance can be prevented only by re gular...

Страница 15: ......

Страница 16: ...RETIGO Ltd Láň 2310 PS 43 756 64 Rožnov pod Radhoštěm Czech republic tel 420 571 665 511 fax 420 571 665 554 e mail info retigo cz www retigo com TSD 11 H EN_R00 ...

Отзывы: