en
4
2
Mounting the station
12
10
11
335
120
90
125
440
317
123
10 Back half of the insulation
11 Front half of the insulation
12 Wall mounting bracket
Controller depending on the version of the station
Î
Determine the mounting site of the station.
Î
Take the station out of the packaging.
Î
Remove the front half of the insulation and the controller panel.
Î
Remove the locking springs from the wall mounting bracket, lift and pull the
flow and return lines off the wall mounting bracket.
Î
Remove the back half of the insulation.
Î
Mark the drill holes by means of the wall mounting bracket, then drill and
insert wall plugs.
Î
Fasten the wall mounting bracket to the wall with the screws. For this purpose,
use a crosshead screw driver.
Î
Push the back half of the insulation onto the wall mounting bracket.
Î
Insert the flow and return lines into the wall mounting bracket and fasten
them by means of the locking springs.
Î
Connect the pipework between pump station and store and collector re-
spectively.
Note
All connections are already tightened such that they usually do not have
to be tightened again. However, during commissioning of the system all
connections have to be checked for leaks (pressure test).
3
Flushing and filling the solar system
WARNING!
Scald danger!
Pressure surge damage!
If the medium enters strongly heated, empty collectors, pressure
surges caused by evaporation can occur.
Î
In order to prevent the solar fluid from vaporising
inside the collectors, do not fill or flush the system
during times of strong irradiation!
5
4
3
1
2
6
7
9
8
1 Safety valve
2 Pressure gauge
3 Drain valve
4 Return ball valve with non-return valve and thermometer handle
5 Fill valve
6 Pump
7 Flowmeter
8 Flow ball valve with non-return valve and thermometer handle
9 Air separator