3. Commissioning
On commissioning you have to adjust primarily the system scheme
1. Ac power supply must be activated. The controller passes
an initialisation phase in which the operating control lamp
flashes red and green. After having finished the initialisation,
the controller is in automatic operation with factory set-
tings. The preadjusted system scheme is Arr 1.
2. - select Arr
- change into
-mode (see 2.1)
- select the system scheme by Arr-characteristics
- adjustment is saved by pressing button
Now the controller is ready for operation and should enable
an optimum operation of the solar system by the factory
settings made.
System survey:
Arr 1 : standard solar system
Arr 2 : solar system with heat exchange
Arr 3 : solar system with after-heating
Arr 4 : solar system with store charge in layers
Arr 5 : 2-store solar system with valve logic
Arr 6 : 2-store solar system with pump logic
Arr 7 : solar system with 2 collectors and 1 store
Arr 8 : solar system with after-heating by solid hot fuel
boilers
Arr 9 : solar system with heating circuit reverse raising
1
3
2
backwards
forward
SET
(Selection / Adjustment mode)
Operation cont-
rol lamp
Arr 1
Arr 2
Arr 3
Arr 4
Arr 5
Arr 6
Arr 7
Arr 8
Arr 9