Resco GB3AAV Скачать руководство пользователя страница 5

1. All air from inside the structure:

a. Each opening MUST have at least 1 sq in. of free area per 1000 Btuh of the total input for all equipment within the confined space, but

not less than 100 sq in. per opening. (See Fig. 2.)

For Example:

GB3AAV FURNACE

INPUT BTUH

FREE AREA PER

OPENING (SQ IN.)

46,000

100

69,000

100

92,000

100

115,000

115

135,000

138

b. If the building is constructed unusually tight, a permanent opening directly communicating with the outdoors should be provided. This

opening should have a minimum free area of 1 sq in. per 5000 Btuh of total input rating for all equipment in the enclosure.

c. If the furnace is installed on a raised platform to provide a return-air plenum, and return air is taken directly from the hallway or space

adjacent to the furnace, all air for combustion must come from outdoors. (See Fig. 3.)

2. All air from outside the structure:

a. If combustion air is taken from outdoors through vertical ducts, the openings and ducts MUST have at least 1 sq in. of free area per 4000

Btuh of the total input for all equipment within the confined space.

For Example:

GB3AAV FURNACE

INPUT BTUH

FREE AREA PER

OPENING (SQ IN.)

ROUND PIPE

(IN. DIA)

46,000

11.5

4

69,000

17.3

5

92,000

23.0

6

115,000

28.8

7

135,000

34.5

7

b. If combustion air is taken from the outdoors through horizontal ducts, the openings and ducts MUST have at least 1 sq in. of free area

per 2000 Btuh of the total input for all equipment within the confined space.

Fig. 2—Air for Combustion and Ventilation

(Inside Air)

A93387

RETURN

AIR

6

 MIN

(FRONT) 

SUPPLY AIR

VENT THROUGH ROOF
(CATEGORY I)

1 SQ IN.
PER 1000
BTUH* IN DOOR

OR WALL 

12

 MAX 

1 SQ IN.
PER 1000
BTUH* IN DOOR

OR WALL

12

 MAX 

INTERIOR

HEATED

SPACE 

* Minimum opening size is 100 square in. with
  minimum dimensions of 3-In. 

† 

Minimum of 3-In. when type B-1 vent is used.

UNCONFINED
SPACE

—5—

Содержание GB3AAV

Страница 1: ...a Working Platform 7 Install Furnace 7 HORIZONTAL CRAWLSPACE INSTALLATION 7 8 FILTER ARRANGEMENT 8 9 GAS PIPING 9 10 ELECTRICAL CONNECTIONS 11 12 115 v Wiring 11 24 v Wiring 11 Accessories 11 12 VENTI...

Страница 2: ...aces are available in sizes 50 000 through 135 000 Btuh input capacities The design of the downflow horizontal gas fired furnace is A G A C G A certified for natural and propane gas and for installati...

Страница 3: ...monoxide poisoning explosion fire electrical shock or other conditions which may cause personal injury loss of life or property damage Consult a qualified installer service agency local gas supplier o...

Страница 4: ...nds which include fluoride chloride bromide and iodide These elements are found in aerosol sprays detergents bleaches cleaning solvents salts air fresheners and other household products CAUTION The op...

Страница 5: ...m outdoors See Fig 3 2 All air from outside the structure a If combustion air is taken from outdoors through vertical ducts the openings and ducts MUST have at least 1 sq in of free area per 4000 Btuh...

Страница 6: ...8 19 7 16 21 19 7 8 19 5 8 19 7 16 24 1 2 23 7 16 19 5 8 19 7 16 These dimensions apply when a model CB or CD Evaporator Coil casing is to be installed B Installation On a Combustible Floor 1 Cut and...

Страница 7: ...shield on platform in front of louvered control panel as shown in Fig 7 PROCEDURE 5 HORIZONTAL CRAWLSPACE INSTALLATION The furnace can be installed horizontally with either the LH or RH side up In a c...

Страница 8: ...turn air plenum See Fig 8 and Table 4 for horizontal applications Horizontal filter retainers must be field supplied See Fig 9 for downflow applications Fig 6 Furnace Plenum and Subbase Installed on a...

Страница 9: ...anadian installations must be installed in accordance with NSCNGPIC and all authorities having jurisdiction The gas supply line should be a separate line directly from the meter to the furnace if poss...

Страница 10: ...d only to the male threads of the joints This pipe dope must be resistant to the action of propane gas Install an accessible manual shut off valve upstream of the furnace gas controls and within 72 in...

Страница 11: ...n electrical shock fire or death B 24 v Wiring Make field 24 v connections at the 24 v terminal strip See Fig 11 Connect terminal Y as shown in Fig 13 for proper operation in cooling mode Use AWG No 1...

Страница 12: ...08 230 VOLT SINGLE PHASE WHT BLK WHT BLK If any of the original wire as supplied must be replaced use same type or equivalent wire NOTE Connect Y terminal as shown for proper operation W Y GND THERMOS...

Страница 13: ...Ignitor warm up At the end of the prepurge period the ignitor is energized for a 17 sec ignitor warm up period c Ignition sequence When the ignitor warm up period is completed the gas valve opens per...

Страница 14: ...DISCONNECT SWITCH AND THE FURNACE JUNCTION BOX JB 5 THIS WIRE MUST BE CONNECTED TO FURNACE SHEETMETAL FOR CONTROL TO DETECT FLAME 6 FACTORY CONNECTED WHEN LGPS NOT USED 7 REPLACE ONLY WITH A 3 AMP FUS...

Страница 15: ...e to follow this warning could result in fire explosion personal injury or death 2 Component test The furnace control allows all components except gas valve to be run for a short period of time This f...

Страница 16: ...40 38 39 3 7 3 2 3 5 40 38 39 3 8 3 3 3 6 905 42 3 5 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 39 3 6 3 4 40 38 39 3 7 3 2 3 5 920 42 3 4 42...

Страница 17: ...In the United States gas input on unit rating plate is for altitudes up to 2000 ft Ratings for altitudes over 2000 ft must be 4 percent less for each 1000 ft above sea level To obtain the adjusted al...

Страница 18: ...0 60 62 64 66 68 60 58 56 54 53 120 116 112 109 106 300 290 281 273 265 25 26 27 28 29 144 138 133 129 124 288 277 267 257 248 720 692 667 643 621 70 72 74 76 78 51 50 48 47 46 103 100 97 95 92 257 25...

Страница 19: ...g the heating cycle length NOTE When using an electronic thermostat set cycle rate for 3 cycles per hr E Check Safety Controls The flame sensor gas valve and pressure switch were all checked in the St...

Страница 20: ...did not function properly and correct condition e Turn off 115 v power to furnace f Reconnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when...

Отзывы: