Resco GB3AAV Скачать руководство пользователя страница 19

c. Adjust air temperature rise by adjusting blower speed. Increase blower speed to reduce temperature rise. Decrease blower speed to

increase temperature rise.

WARNING: Disconnect the electrical power before changing the speed tap. Failure to follow this warning could result

in personal injury.

d. To change blower motor speed selections for heating mode, remove blower motor lead from control board HEAT terminal. (See Fig.

11.) Select desired blower motor speed lead from 1 of the other terminals and relocate it to HEAT terminal. See Table 10 for lead color
identification. Reconnect original lead on SPARE terminal.

Follow this same procedure for proper selection of COOL speed selection.

CAUTION: Recheck temperature rise. It must be within limits specified on unit rating plate. Recommended operation

is at midpoint of rise or above.

3. Set thermostat heat anticipator.

The thermostat heat anticipation must be set to match the amp draw of the electrical components in the R-W circuit. Accurate amp draw
readings can be obtained at thermostat subbase terminals R and W. Fig. 17 illustrates an easy method of obtaining the actual amp draw.
The amp reading should be taken after the blower motor has started. See the thermostat manufacturer’s instructions for adjusting the heat
anticipator and for varying the heating cycle length.

NOTE:

When using an electronic thermostat, set cycle rate for 3 cycles per hr.

E.

Check Safety Controls

The flame sensor, gas valve, and pressure switch were all checked in the Start-up Procedures section as part of normal operation.

1. Check primary limit control.

This control shuts off the combustion control system and energizes the circulating-air blower motor if the furnace overheats.

The preferred method of checking the limit control is to gradually block off the return air after the furnace has been operating for a period
of at least 5 minutes. As soon as the limit has shut off the burners, the return-air opening should be unblocked. By using this method to
check the limit control, it can be established that the limit is functioning properly and operates if there is a motor failure.

2. Check draft safeguard switch.

The purpose of this control is to permit the safe shutdown of the furnace during certain blocked vent conditions.

Table 9—Canadian Orifice Size

GAS

SEA LEVEL 0-2000 FT

HIGH ALTITUDE

2000-4500 FT

Natural

43

44

Propane

54

55

Table 10—Speed Selector

COLOR

SPEED

FACTORY

ATTACHED TO

Black

High

COOL

Yellow

(When present)

Medium-High

SPARE

Blue

Medium-Low

HEAT

Red

Low

SPARE

White

Common

COM

Fig. 17—Amp Draw Check With Ammeter

A80201

R

Y W G

10 TURNS

THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED

HOOK-AROUND

VOLT/AMMETER

EXAMPLE:

5.0 AMPS ON AMMETER
10 TURNS AROUND JAWS

 

= 0.5 AMPS FOR THERMOSTAT SETTING

FROM UNIT 24-VOLT
TERMINAL BLOCK

—19—

Содержание GB3AAV

Страница 1: ...a Working Platform 7 Install Furnace 7 HORIZONTAL CRAWLSPACE INSTALLATION 7 8 FILTER ARRANGEMENT 8 9 GAS PIPING 9 10 ELECTRICAL CONNECTIONS 11 12 115 v Wiring 11 24 v Wiring 11 Accessories 11 12 VENTI...

Страница 2: ...aces are available in sizes 50 000 through 135 000 Btuh input capacities The design of the downflow horizontal gas fired furnace is A G A C G A certified for natural and propane gas and for installati...

Страница 3: ...monoxide poisoning explosion fire electrical shock or other conditions which may cause personal injury loss of life or property damage Consult a qualified installer service agency local gas supplier o...

Страница 4: ...nds which include fluoride chloride bromide and iodide These elements are found in aerosol sprays detergents bleaches cleaning solvents salts air fresheners and other household products CAUTION The op...

Страница 5: ...m outdoors See Fig 3 2 All air from outside the structure a If combustion air is taken from outdoors through vertical ducts the openings and ducts MUST have at least 1 sq in of free area per 4000 Btuh...

Страница 6: ...8 19 7 16 21 19 7 8 19 5 8 19 7 16 24 1 2 23 7 16 19 5 8 19 7 16 These dimensions apply when a model CB or CD Evaporator Coil casing is to be installed B Installation On a Combustible Floor 1 Cut and...

Страница 7: ...shield on platform in front of louvered control panel as shown in Fig 7 PROCEDURE 5 HORIZONTAL CRAWLSPACE INSTALLATION The furnace can be installed horizontally with either the LH or RH side up In a c...

Страница 8: ...turn air plenum See Fig 8 and Table 4 for horizontal applications Horizontal filter retainers must be field supplied See Fig 9 for downflow applications Fig 6 Furnace Plenum and Subbase Installed on a...

Страница 9: ...anadian installations must be installed in accordance with NSCNGPIC and all authorities having jurisdiction The gas supply line should be a separate line directly from the meter to the furnace if poss...

Страница 10: ...d only to the male threads of the joints This pipe dope must be resistant to the action of propane gas Install an accessible manual shut off valve upstream of the furnace gas controls and within 72 in...

Страница 11: ...n electrical shock fire or death B 24 v Wiring Make field 24 v connections at the 24 v terminal strip See Fig 11 Connect terminal Y as shown in Fig 13 for proper operation in cooling mode Use AWG No 1...

Страница 12: ...08 230 VOLT SINGLE PHASE WHT BLK WHT BLK If any of the original wire as supplied must be replaced use same type or equivalent wire NOTE Connect Y terminal as shown for proper operation W Y GND THERMOS...

Страница 13: ...Ignitor warm up At the end of the prepurge period the ignitor is energized for a 17 sec ignitor warm up period c Ignition sequence When the ignitor warm up period is completed the gas valve opens per...

Страница 14: ...DISCONNECT SWITCH AND THE FURNACE JUNCTION BOX JB 5 THIS WIRE MUST BE CONNECTED TO FURNACE SHEETMETAL FOR CONTROL TO DETECT FLAME 6 FACTORY CONNECTED WHEN LGPS NOT USED 7 REPLACE ONLY WITH A 3 AMP FUS...

Страница 15: ...e to follow this warning could result in fire explosion personal injury or death 2 Component test The furnace control allows all components except gas valve to be run for a short period of time This f...

Страница 16: ...40 38 39 3 7 3 2 3 5 40 38 39 3 8 3 3 3 6 905 42 3 5 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 39 3 6 3 4 40 38 39 3 7 3 2 3 5 920 42 3 4 42...

Страница 17: ...In the United States gas input on unit rating plate is for altitudes up to 2000 ft Ratings for altitudes over 2000 ft must be 4 percent less for each 1000 ft above sea level To obtain the adjusted al...

Страница 18: ...0 60 62 64 66 68 60 58 56 54 53 120 116 112 109 106 300 290 281 273 265 25 26 27 28 29 144 138 133 129 124 288 277 267 257 248 720 692 667 643 621 70 72 74 76 78 51 50 48 47 46 103 100 97 95 92 257 25...

Страница 19: ...g the heating cycle length NOTE When using an electronic thermostat set cycle rate for 3 cycles per hr E Check Safety Controls The flame sensor gas valve and pressure switch were all checked in the St...

Страница 20: ...did not function properly and correct condition e Turn off 115 v power to furnace f Reconnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when...

Отзывы: