Energy storage integrated machine
Installation
-16-
No.
Name
A
PV string
B
PV side DC switch (DC600V, C32A, 2P)
C
Energy storage inverter(or Hybrid Inverter )
D
AC switch (AC250V,C40A, 2P)
E
Digital meter
F
Public grid
G
Load
*Electrical connection must be carried out by professional technicians as wrong
operation may cause damage to the device, physical injuries or even death during
system operation.
*All the electrical installation must conform to the national regulations concerning
electrical safety.
*Ensure all the cables are installed firmly according to the specified safety
Energy storage integrated
machine model
Battery cable
Recommended min. cross-sectional area mm
2
(length W 5 m)
3kW
16
5kW
25