23
en
Fixscreen
®
100
EVO
Solar
7 • Final check of the screen
➋
Put back the front section of the side channels and coupling side channel (Allen key no. 3).
➌
Check if the end points are set. If they are not set, set the end points so the motor
automatically stops in the desired highest and lowest position (see documents on motor
adjustment).
➍
Make sure to set the lower end point at a 10 mm from the end of the side channels so the
fabric remains at the correct tension.
➎
Check if all screws, bolts and nuts are firmly tightened.
➏
Roll the screen up and down several times to ensure proper operation.
H1
H2
D1
D2
➊
Before starting the motor,
check if the set-up is square.
The diagonals (D1 and D2)
and parallels (H1 and H2)
should be as equal as possible
for the fabric to properly
unwind.
D1 = D2 and H1 = H2
Содержание Fixscreen 100EVO Solar
Страница 1: ...Fixscreen 100EVO Solar Montagerichtlinien Installation instructions ...
Страница 26: ...26 Fixscreen 100 EVO Solar ...
Страница 27: ...27 Fixscreen 100 EVO Solar ...