6 in / 154mm
6 in / 154mm
Installation
Connect the battery terminal wires to the Charge controller FIRST then connect the
solar panels to the charge controller SECOND. Connecting panels before the
battery may result in irreversible damage.
Never install the controller in a sealed enclosure with flooded batteries as gas may
accumulate and there is a risk of explosion.
Do not over-tighten the terminals. This could potentially break mounting
components rendering the controller useless.
Connections should be made according to Article 690 of the National Electrical
Code (NFPA 70) or the standards in force at the installation location.
CAUTION
CAUTION
WARNING
08
Mounting Recommendations
10a solar charge controller
rover boost
1. Choose Mounting Location—
place the controller on a vertical surface protected from
direct sunlight, high temperatures, and water. Make sure there is good ventilation.
2. Check for Clearance—
verify that there is sufficient room to run wires, as well as clearance
above and below the controller for ventilation. The clearance should be at least 6 inches (154mm).
3. Mark Holes
4. Drill Holes
5. Secure the charge controller.